Empirical evidence of extension of time in construction projects

AbstractAlmost all construction projects face delays resulting in extension of time (EOT) or liquidated damages, depending upon which of the two parties absorbs the responsibility as per terms of t...

[1]  Muhammad Jamaluddin Thaheem,et al.  Use of offsite construction techniques in Pakistan , 2016 .

[2]  Zia Ud Din,et al.  Integration of BIM in Construction Management Education: An Overview of Pakistani Engineering Universities , 2016 .

[3]  Remon Fayek Aziz,et al.  Exploring delay causes of road construction projects in Egypt , 2016 .

[4]  Irfan Anjum Manarvi,et al.  Time Extension Factors in Construction Industry of Pakistan , 2014 .

[5]  Danijel Rebolj,et al.  Interoperability requirements for automated manufacturing systems in construction , 2016, J. Intell. Manuf..

[6]  Jimmie Hinze,et al.  Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines , 2014 .

[7]  Rafiq M. Choudhry Appointing the Design Consultant as Supervision Consultant on Construction Projects , 2016 .

[8]  S. Abourizk,et al.  Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules , 2016 .

[9]  Khaled A El-Rayes,et al.  Optimizing Resource Leveling in Construction Projects , 2009 .

[10]  A. Maqsoom,et al.  Motives and competitive assets of Pakistani international construction contracting firms , 2014 .

[11]  Kiyoshi Kobayashi,et al.  Delay Analysis Methods for Construction Projects: Mathematical Modelling , 2015 .

[12]  Ahmad Anuar Othman,et al.  Factors influencing the construction time of civil engineering projects in Malaysia , 2006 .

[13]  Rod Gameson,et al.  Delay Analysis within Construction Contracting Organizations , 2008 .

[14]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[15]  Islam H. El-adaway,et al.  Administering Extension of Time under National and International Standard Forms of Contracts: A Contractor’s Perspective , 2016 .

[16]  Tony Farrow Developments in the Analysis of Extensions of Time , 2007 .

[17]  Muhammad Jamaluddin Thaheem,et al.  A review of public-private partnership: critical factors of concession period , 2016 .

[18]  David N. Ford Achieving Multiple Project Objectives through Contingency Management , 2002 .

[19]  Ajibade Ayodeji Aibinu,et al.  Avoiding and Mitigating Delay and Disruption Claims Conflict: Role of Precontract Negotiation , 2009 .

[20]  Terry Williams,et al.  Assessing Extension of Time delays on major projects , 2003 .

[21]  Kumar Neeraj Jha,et al.  Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects , 2006 .

[22]  Pardis Pishdad-Bozorgi,et al.  Readiness Assessment for Flash Tracking , 2016 .

[23]  Mohammad Fadhil Mohammad,et al.  Delay Analysis Methodologies (DAMs) in Delivering Quality Projects: Contractors and Consultants’ Perceptions , 2016 .

[24]  Jesus M. de la Garza,et al.  Total float traded as commodity , 1991 .

[25]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[26]  William Ibbs,et al.  FLORA: New Forensic Schedule Analysis Technique , 2008 .

[27]  Tarek Hegazy,et al.  Daily Windows Delay Analysis , 2005 .

[28]  M. Khalfan,et al.  Methods used to procure infrastructure projects in Pakistan: an overview , 2012 .

[29]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[30]  Keith W. Hipel,et al.  Conflict resolution in construction disputes using the graph model , 2006 .

[31]  Mehmet Emre Bayraktar,et al.  Judiciary’s Use of the Critical Path Method to Resolve Construction Claims , 2012 .

[32]  Tak Wing Yiu,et al.  Decision-making model for selecting the optimum method of delay analysis in construction projects , 2016 .

[33]  Feniosky Peña-Mora,et al.  Integrated Sequential As-Built and As-Planned Representation with D4AR Tools in Support of Decision-Making Tasks in the AEC/FM Industry , 2011 .

[34]  Ali A. Shash,et al.  The effect of contractor size on mark-up size decision in Saudi Arabia , 1993 .

[35]  Muhammad Jamaluddin Thaheem,et al.  Six Sigma in construction: a review of critical success factors , 2016 .

[36]  Rafiq M. Choudhry,et al.  Identification of Risk Management System in Construction Industry in Pakistan , 2013 .

[37]  Khalid S. Al-Gahtani,et al.  Total float management: computerized technique for construction delay analysis , 2016 .

[38]  N. Grigg,et al.  Delay Claims in Road Construction: Best Practices for a Standard Delay Claims Management System , 2016 .