Operation safety assessment of high-speed train with fuzzy group decision making method and empirical research

High-speed train plays a great significant role in the safe operation of high-speed railway. To ensure the safety and reliability of high-speed train, it is necessary to study the operation safety assessment of high-speed train. Based on its complex integrated mechatronic structure, a multiplex network model is made to study the reliability of high-speed train system and some characters of the model are obtained to establish the operation safety assessment index system associated with people, environment, infrastructure and inherent risk of high-speed train. Considering the uncertainty in the process of operation safety assessment, a new decision model combining intuitionistic fuzzy set and VIKOR method is proposed and applied to the CRH2 high-speed train bogie system operation safety assessment, and Frame Assembly comes the highest risk. The result shows the feasibility and applicability of the method and can provide important technical support for decision-makers.

[1]  Xiukun Wei,et al.  Track quality prediction based on center approach Markov-Grey GM(1,1) model , 2014, International Conference on Informatics and Analytics.

[3]  Wenjin Zhang,et al.  Research on the Reliability Growth Management Techniques of High-Speed Train for Whole Life Cycle , 2013 .

[4]  Faruk Kazi,et al.  Impact of Topology on the Propagation of Cascading Failure in Power Grid , 2016, IEEE Transactions on Smart Grid.

[5]  Haibo He,et al.  Integrated Security Analysis on Cascading Failure in Complex Networks , 2014, IEEE Transactions on Information Forensics and Security.

[6]  Hongfeng Qi,et al.  The Reliability Modeling and Analysis on Brake System of Medium-low Speed Maglev Train , 2012, 2012 International Conference on Computer Distributed Control and Intelligent Environmental Monitoring.

[7]  Valentina Y. Guleva,et al.  Using Multiplex Networks for Banking Systems Dynamics Modelling , 2015 .

[8]  Jukka-Pekka Onnela,et al.  Community Structure in Time-Dependent, Multiscale, and Multiplex Networks , 2009, Science.

[9]  Xinhong Hei,et al.  Safety and Reliability Estimation of Automatic Train Protection and Block System , 2014, Qual. Reliab. Eng. Int..

[10]  Harald Bugmann,et al.  Warming, photoperiods, and tree phenology. , 2010, Science.

[11]  Wei Wei,et al.  The impact of personality on driving safety among Chinese high-speed railway drivers. , 2016, Accident; analysis and prevention.

[12]  G. Gou,et al.  Effect of humidity on porosity, microstructure, and fatigue strength of A7N01S-T5 aluminum alloy welded joints in high-speed trains , 2015 .

[13]  Yanbing Ju,et al.  Extension of VIKOR method for multi-criteria group decision making problem with linguistic information , 2013 .

[14]  A. Prabhakar,et al.  New Topological Formula and Rapid Algorithm for Reliability Analysis of Complex Networks , 1978, IEEE Transactions on Reliability.

[15]  A. Sousa-Poza,et al.  Long Work Hours and Health in China , 2015, SSRN Electronic Journal.

[16]  Patrick Thiran,et al.  Layered complex networks. , 2006, Physical review letters.

[17]  K. Atanassov Remarks on the intuitionistic fuzzy sets , 1992 .

[18]  Yanhui Wang,et al.  Reliability evaluation for complex system based on connectivity reliability of network model , 2015, 2015 International Conference on Logistics, Informatics and Service Sciences (LISS).

[19]  Kavita Devi,et al.  Extension of VIKOR method in intuitionistic fuzzy environment for robot selection , 2011, Expert Syst. Appl..

[20]  Limin Jia,et al.  Proceedings of the 2015 International Conference on Electrical and Information Technologies for Rail Transportation , 2016 .

[21]  Enrico Zio,et al.  Modeling Interdependent Network Systems for Identifying Cascade-Safe Operating Margins , 2011, IEEE Transactions on Reliability.

[22]  Zhihua Zhang,et al.  Dynamic characteristics of track-ballast-silty clay with irregular vibration levels generated by high-speed train based on DEM , 2016 .

[23]  Yong Qin,et al.  Reliability Study of Bogie System of High-Speed Train Based on Complex Networks Theory , 2016 .

[24]  Antonio Scala,et al.  Networks of Networks: The Last Frontier of Complexity , 2014 .

[25]  Ke Huang,et al.  Fault diagnosis approach of traction transformers in high-speed railway combining kernel principal component analysis with random forest , 2016 .

[26]  Robert LIN,et al.  NOTE ON FUZZY SETS , 2014 .

[27]  Jiali Liu,et al.  Investigation of aerodynamic effects on the high-speed train exposed to longitudinal and lateral wind velocities , 2016 .

[28]  Gwo-Hshiung Tzeng,et al.  Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS , 2004, Eur. J. Oper. Res..

[29]  K. L. Edwards,et al.  VIKOR method for material selection problems with interval numbers and target-based criteria , 2013 .

[30]  Lu Qing A Method of Multi-Attribute Group Decision Making with Incomplete Hybrid Assessment Information , 2009 .

[31]  Bing Li,et al.  Dynamic multi-attribute decision making model based on triangular intuitionistic fuzzy numbers , 2011 .