A PLM components monitoring framework for SMEs based on a PLM maturity model and FAHP methodology

Abstract—Right PLM components selection and investments increase business advantages. This paper develops a PLM components monitoring framework to assess and guide PLM implementation in small and middle enterprises (SMEs). The framework builds upon PLM maturity models and decision-making methodology. PLM maturity model has the capability to analyze PLM functionalities and evaluate PLM components. A proposed PLM components maturity assessment (PCMA) model can obtain general maturity levels of PLM components based on key performance indicators. Investment decisions should be made from the relatively weaker PLM components based on the results of PCMA. One developed method of the fuzzy analytical hierarchy process (Fuzzy AHP) is applied to extract the premier improvement component needed. The results of a first empirical assessment in a swimming industry are presented, which could be used as benchmark data for the other Small and Medium sized Enterprises (SMEs) to develop their own PLM components monitoring framework to increase the success of their PLM implementation.

[1]  Zhongsheng Hua,et al.  A modified fuzzy logarithmic least squares method for fuzzy analytic hierarchy process , 2006, Fuzzy Sets Syst..

[2]  Yacine Ouzrout,et al.  Sustainability consideration within product lifecycle management through maturity models analysis , 2014 .

[3]  Bojan Srdjevic,et al.  Combining different prioritization methods in the analytic hierarchy process synthesis , 2005, Comput. Oper. Res..

[4]  Ludmil Mikhailov,et al.  Evaluation of services using a fuzzy analytic hierarchy process , 2004, Appl. Soft Comput..

[5]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[6]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[7]  Remko Helms,et al.  PLM roadmap: stepwise PLM implementation based on the concepts of maturity and alignment , 2006 .

[8]  Jing-Rung Yu,et al.  An integrated approach for deriving priorities in analytic network process , 2007, Eur. J. Oper. Res..

[9]  James J. Buckley,et al.  Fuzzy hierarchical analysis: the Lambda-Max method , 2001, Fuzzy Sets Syst..

[10]  Tobias Bensiek,et al.  Maturity Model for Improving Virtual Engineering in Small and Medium-Sized Enterprises , 2012, PLM.

[11]  Shaowen Qin,et al.  Operationalising CMMI: integrating CMMI and CoBIT perspective , 2011 .

[12]  Stephen Evans,et al.  KM your way to CMMI , 2006, J. Knowl. Manag..

[13]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[14]  Claus-Michael Seiler,et al.  Product lifecycle management , 2006, Wirtschaftsinf..

[15]  Yacine Ouzrout,et al.  Selection of product lifecycle management components based on AHP methodologies , 2013, 2013 International Conference on Advanced Logistics and Transport.

[16]  Ruoning Xu,et al.  Fuzzy least-squares priority method in the analytic hierarchy process , 2000, Fuzzy Sets Syst..

[17]  William E. Hefley,et al.  People Capability Maturity Model (P-CMM) Version 2.0 , 2001 .

[18]  Geert Poels,et al.  Towards a Decision Tool for Choosing a Business Process Maturity Model , 2012, DESRIST.

[19]  W. Pedrycz,et al.  A fuzzy extension of Saaty's priority theory , 1983 .

[20]  Mark C. Paulk,et al.  Capability Maturity Model , 1991 .

[21]  A. Sharma,et al.  Collaborative product innovation: integrating elements of CPI via PLM framework , 2005, Comput. Aided Des..

[22]  Jafar Rezaei,et al.  An improved fuzzy preference programming to evaluate entrepreneurship orientation , 2013, Appl. Soft Comput..