Ground equipment a high-speed railway train control system

The present invention provides a high-speed railway train control system ground equipment, including centralized scheduling control sub-region next to the control subsystem, the target track center and the radio communication control unit side track; wherein: the scheduling data centralized control subsystem CTC a plurality of Ethernet communication with the wayside communication control subsystem region; each region of said wayside control subsystem control unit via the field bus communication with a plurality of said rail adjacent a target; the wireless communication using a secure communication protocol center implementing the control region trackside continuous, two-way secure communication between the subsystem and the area under the jurisdiction of the train. The invention achieves the intelligent maintenance decision-making level and distribution of, and decision-making for quick maintenance unfavorable data.