A Markovian production-inventory system with consideration of random quality disruption
暂无分享,去创建一个
[1] Ata Allah Taleizadeh,et al. An imperfect multi-product production system with rework , 2013 .
[2] Mohsen A. Hassan,et al. Optimization of reliability based model for production inventory system , 2018 .
[3] Ata Allah Taleizadeh,et al. A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process , 2014 .
[4] Leopoldo Eduardo Cárdenas-Barrón,et al. A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints , 2020, Ann. Oper. Res..
[5] I Nyoman Pujawan,et al. Factors affecting schedule instability in manufacturing companies , 2012 .
[6] Bhaba R. Sarker,et al. Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..
[7] Leopoldo Eduardo Cárdenas-Barrón,et al. Multi-machine economic production quantity for items with scrapped and rework with shortages and allocation decisions , 2017 .
[8] Nita H. Shah,et al. Imperfect production inventory model for time and effort dependent demand under inflation and maximum reliability , 2018 .
[9] W. Feller,et al. An Introduction to Probability Theory and Its Application. , 1951 .
[10] K. S. Chaudhuri,et al. Maximising profits for an EPQ model with unreliable machine and rework of random defective items , 2013, Int. J. Syst. Sci..
[11] Syed Naveed Khursheed,et al. Integrating quality and maintenance decisions in a production-inventory model for deteriorating items , 2005 .
[12] Yuan-Shyi Peter Chiu,et al. Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision , 2019 .
[13] Leopoldo Eduardo Cárdenas-Barrón,et al. Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage , 2018, RAIRO Oper. Res..
[14] Yuan-Shyi Peter Chiu,et al. A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns" , 2007, Eur. J. Oper. Res..
[15] Koji Okuhara,et al. A Two Stage Solution Procedure for Production Planning System with Advance Demand Information , 2012 .
[16] Ali Akbar Shaikh,et al. A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions , 2018, RAIRO Oper. Res..
[17] Roy D. Yates,et al. Probability and stochastic processes , 1998 .
[18] Brojeswar Pal,et al. Price-sensitive imperfect production inventory model with exponential partial backlogging , 2019 .
[19] L. Cárdenas-Barrón,et al. A production-inventory model for a two-echelon supply chain when demand is dependent on sales teams׳ initiatives , 2014 .
[20] Leopoldo Eduardo Cárdenas-Barrón,et al. A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions , 2016, Expert Syst. Appl..
[21] Ali Akbar Shaikh,et al. A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability , 2017, Appl. Soft Comput..
[22] Harun Öztürk,et al. Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs , 2018, Oper. Res..
[23] Sanjoy Kumar Paul,et al. Optimisation of a production inventory model with reliability considerations , 2014 .
[24] K. S. Chaudhuri,et al. Optimal reliability, production lot size and safety stock in an imperfect production system , 2010, Int. J. Math. Oper. Res..