A Decision Support System for managing Line Stops of Time Constraint Tunnels
暂无分享,去创建一个
[1] Dong-Seok Sun,et al. Scheduling and control for time-constrained processes in semiconductor manufacturing , 2005, ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005..
[2] Claude Yugma,et al. Production control in semiconductor manufacturing with time constraints , 2015, 2015 26th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC).
[3] Ammar Oulamara,et al. Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times , 2008 .
[4] R. Tavakkoli-Moghaddam,et al. Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times , 2013, The International Journal of Advanced Manufacturing Technology.
[5] Saeed Yaghoubi,et al. Solving a new multi-objective hybrid flexible flowshop problem with limited waiting times and machine-sequence-dependent set-up time constraints , 2014, Int. J. Comput. Integr. Manuf..
[6] Chen-Fu Chien,et al. A novel timetabling algorithm for a furnace process for semiconductor fabrication with constrained waiting and frequency-based setups , 2007, OR Spectr..
[7] Andreas Klemmt,et al. Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).
[8] Jen-Shiang Chen,et al. Model formulations for the machine scheduling problem with limited waiting time constraints , 2006 .
[9] Marcel Stehli,et al. An effective problem decomposition method for scheduling of diffusion processes based on mixed integer linear programming , 2014, ASMC 2013 SEMI Advanced Semiconductor Manufacturing Conference.