Work-in-process clearing in supply chain operations planning

In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a deterministic order release planning model to anticipate the dynamics of the operational level, which is subject to uncertainties. A multi-period single-item order release and scheduling problem is considered in which the delivery schedule of the orders is determined through the planned lead times, and the capacity loading decisions are separated from the order release decisions in a way so as to plan for on-time deliveries. Early or late delivery of the orders, which are released and delivered in batches, has not been considered explicitly in previous studies on clearing functions, and it significantly affects the inventory costs. Both linear and non-linear clearing functions are tested using a simulation approach. The results indicate that modeling the clearing of WIP by a shop should be based on the short-term operational dynamics of the shop rather than on the long-term average shop behavior, since it improves the consistency between the operational planning and scheduling levels of the hierarchy. The presented methods and results provide valuable information on modeling production characteristics in aggregate production planning and scheduling models.

[1]  Hubert Missbauer,et al.  Aggregate order release planning for time-varying demand , 2002 .

[2]  Christoph Schneeweiβ,et al.  Hierarchical structures in organisations: A conceptual framework , 1995 .

[3]  R. Uzsoy,et al.  Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.

[4]  Jeremy F. Shapiro,et al.  Mathematical programming models and methods for production planning and scheduling , 1988 .

[5]  D. Armbruster,et al.  Continuous models for production flows , 2004, Proceedings of the 2004 American Control Conference.

[6]  Jan Fransoo,et al.  Planning Supply Chain Operations: Definition and Comparison of Planning Concepts , 2003, Supply Chain Management.

[7]  Jeremy F. Shapiro,et al.  Chapter 8 Mathematical programming models and methods for production planning and scheduling , 1993, Logistics of Production and Inventory.

[8]  Stephen C. Graves,et al.  A Tactical Planning Model for a Job Shop , 1986, Oper. Res..

[9]  Jan Karel Lenstra,et al.  Linear programming models with planned lead times for supply chain operations planning , 2005, Eur. J. Oper. Res..

[10]  Nico Vandaele,et al.  A general approximation for the single product lot sizing model with queueing delays , 1996 .

[11]  John O. McClain,et al.  Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .

[12]  Jwm Will Bertrand,et al.  The structuring of production control systems , 1986 .

[13]  Robert C. Leachman,et al.  A general framework for modeling production , 1989 .

[14]  de Ag Ton Kok,et al.  The effect of updating lead times on the performance of hierarchical planning systems , 2006 .

[15]  Uday S. Karmarkar,et al.  Lot Sizes, Lead Times and In-Process Inventories , 1987 .

[16]  Hartmut Stadtler,et al.  Supply Chain Management and Advanced Planning: Concepts, Models, Software, and Case Studies , 2010 .

[17]  David L. Woodruff,et al.  Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .

[18]  de Ag Ton Kok,et al.  A safety stock adjustment procedure to enable target service levels in simulation of generic inventory systems , 2002 .

[19]  Uday S. Karmarkar,et al.  Chapter 6 Manufacturing lead times, order release and capacity loading , 1993, Logistics of Production and Inventory.

[20]  Hubert Missbauer,et al.  Production Planning and Control (PPC) systems including load-oriented order release — Problems and research perspectives , 1993 .

[21]  Chen-Hua Chung,et al.  Planning horizons for master production scheduling , 1984 .

[22]  Germán Riaño,et al.  Transient behavior of stochastic networks :application to production planning with load-dependent lead times , 2002 .

[23]  G. Zäpfel,et al.  New concepts for production planning and control , 1993 .

[24]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[25]  Jm Judith Spitter,et al.  Timing production in LP models in a rolling schedule , 2005 .