Comparison of Performance of SSSC and TCPS in Automatic Generation Control of Hydrothermal System under Deregulated Scenario
暂无分享,去创建一个
[1] L. K. Kirchmayer,et al. Tie-line power and frequency control , 1954, Electrical Engineering.
[2] C. Concordia,et al. Tie-Line Power and Frequency Control of Electric Power Systems [includes discussion] , 1953, Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems.
[3] B. H. Bakken,et al. Automatic generation control in a deregulated power system , 1998 .
[4] Gerald B. Sheblé,et al. AGC simulator for price-based operation. I. A model , 1997 .
[5] Ieee Report,et al. Dynamic Models for Steam and Hydro Turbines in Power System Studies , 1973 .
[6] R. P. Schulte,et al. An automatic generation control modification for present demands on interconnected power systems , 1996 .
[7] Chun-Chang Liu,et al. Effect of battery energy storage system on load frequency control considering governor deadband and generation rate constraint , 1995 .
[8] Ranjit Roy,et al. Coordinated control of SSSC and SMES in competitive electricity market for load frequency control , 2010, 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems.