Project scheduling with time window constraints on multi-skill resources
暂无分享,去创建一个
[1] Nai-Hsin Pan,et al. A study of project scheduling optimization using Tabu Search algorithm , 2008, Eng. Appl. Artif. Intell..
[2] X. Cai,et al. A genetic algorithm for scheduling staff of mixed skills under multi-criteria , 2000, Eur. J. Oper. Res..
[3] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[4] Reza Zamani,et al. A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem , 2013, Eur. J. Oper. Res..
[5] Mehran Hojati,et al. An integer linear programming-based heuristic for scheduling heterogeneous, part-time service employees , 2011, Eur. J. Oper. Res..
[6] Francisco Ballestín,et al. Justification and RCPSP: A technique that pays , 2005, Eur. J. Oper. Res..
[7] John W. Fowler,et al. Heuristics for workforce planning with worker differences , 2008, Eur. J. Oper. Res..
[8] Aiying Rong,et al. Monthly tour scheduling models with mixed skills considering weekend off requirements , 2010, Comput. Ind. Eng..
[9] Sally A. McKee,et al. Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem , 2008, Comput. Oper. Res..
[10] Liu Shi-xin,et al. A new method to solve project scheduling problems with multi-skilled workforce constraints , 2013, 2013 25th Chinese Control and Decision Conference (CCDC).
[11] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[12] Odile Bellenguez-Morineau,et al. A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem , 2007, RAIRO Oper. Res..
[13] Lucio Bianco,et al. An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations , 2012, Eur. J. Oper. Res..