Decision-making under uncertaintly in remanufacturing processes: An exploratory study
暂无分享,去创建一个
[1] Alan Scheller-Wolf,et al. Assessing the Impact of RFID on Return Center Logistics , 2006, Interfaces.
[2] Frédéric Thiesse,et al. Assessing the impact of RFID and sensor technologies on the returns management of time-sensitive products , 2010, Bus. Process. Manag. J..
[3] Ronald S. Tibben-Lembke,et al. AN EXAMINATION OF REVERSE LOGISTICS PRACTICES , 2001 .
[4] Sergio Rubio,et al. Characteristics of the research on reverse logistics (1995–2005) , 2008 .
[5] V. Daniel R. Guide,et al. OR FORUM - The Evolution of Closed-Loop Supply Chain Research , 2009, Oper. Res..
[6] Dong-Ho Lee,et al. Solution algorithms for dynamic lot-sizing in remanufacturing systems , 2011 .
[7] Rommert Dekker,et al. Inventory Control in Hybrid Systems with Remanufacturing , 1999 .
[8] Nicolaj Siggelkow. Persuasion with case studies , 2007 .
[9] K. Eisenhardt. Building theories from case study research , 1989, STUDI ORGANIZZATIVI.
[10] D. Whetten. What Constitutes a Theoretical Contribution , 1989 .
[11] R. Srivastava,et al. Production planning and control for remanufacturing: a state - of - the - art survey , 1999 .
[12] Jack R. Meredith,et al. Building operations management theory through case and field research , 1998 .
[13] Ben A. Chaouch,et al. A robust block-chain based tabu search algorithm for the dynamic lot sizing problem with product returns and remanufacturing , 2014 .
[14] R. Dekker,et al. Inventory control policies for inspection and remanufacturing of returns: A case study , 2010 .
[15] Rajesh Srivastava,et al. Scheduling policies for remanufacturing , 1997 .
[16] Lifeng Zhang,et al. Recovery of Metallic Materials from Printed Wiring Boards by Green Pyrolysis Process , 2012 .
[17] Tobias Schulz,et al. On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield , 2011 .
[18] Geraldo Ferrer. Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..
[19] J. Meredith,et al. Alternative research paradigms in operations , 1989 .
[20] Geraldo Ferrer,et al. MATERIAL PLANNING FOR A REMANUFACTURING FACILITY , 2001 .
[21] Basheer M. Khumawala,et al. Enhancing Product Recovery Value in Closed-Loop Supply Chains with RFID , 2007 .
[22] Rajesh Srivastava,et al. Inventory buffers in recoverable manufacturing , 1998 .
[23] Michael R. Johnson,et al. Planning product disassembly for material recovery opportunities , 1995 .
[24] Geoffrey P. Hammond,et al. Development of robust design-for-remanufacturing guidelines to further the aims of sustainable development , 2007 .
[25] Christopher W. Craighead,et al. Operations management research: evolution and alternative future paths , 2008 .
[26] P. Daugherty,et al. Reverse logistics: superior performance through focused resource commitments to information technology , 2005 .
[27] Mohamad Y. Jaber,et al. Lot sizing for a recoverable product with inspection and sorting , 2010, Comput. Ind. Eng..
[28] Richard P. Vlosky,et al. Partnering relationship activities: Building theory from case study research , 1997 .
[29] Michael R. Galbreth,et al. Optimal Acquisition and Sorting Policies for Remanufacturing , 2006 .
[30] Kathleen M. Eisenhardt,et al. Theory Building From Cases: Opportunities And Challenges , 2007 .
[31] V. Guide. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[32] Vaidyanathan Jayaraman,et al. Role of information technology and collaboration in reverse logistics supply chains , 2008 .
[33] Christos Zikopoulos,et al. On the attractiveness of sorting before disassembly in remanufacturing , 2008 .
[34] Winifred Ijomah,et al. Application of active disassembly to extend profitable remanufacturing in small electrical and electronic products , 2010 .
[35] X. Wen,et al. An extended GRAI model for enterprise process diagnosis , 2007, Int. J. Comput. Integr. Manuf..
[36] Winifred Ijomah,et al. Addressing decision making for remanufacturing operations and design-for-remanufacture , 2009 .
[37] M. H. Wang,et al. ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .
[38] Diane A. Mollenkopf,et al. Creating value through returns management: Exploring the marketing–operations interface , 2011 .
[39] Rajesh Piplani,et al. A coordination framework for supply chain inventory alignment , 2005 .
[40] Che-Fu Hsueh. An inventory control model with consideration of remanufacturing and product life cycle , 2011 .
[41] R. Yin,et al. Case Study Research: Design and Methods (4th ed. , 2009 .
[42] Surendra M. Gupta,et al. Buffer allocation plan for a remanufacturing cell , 2005, Comput. Ind. Eng..