Web‐based integrated project control system

This paper presents a system that supports project time and cost control in an integrated manner. The system utilizes object‐oriented modelling to represent the process of project delivery. A set of control objects is designed to map the process of project control. Eighteen key indicators are considered to represent the resources utilized in each control object and serve as sensors to highlight problematic areas associated with unfavourable performance. A Three‐Tier Client/Sever computer system is designed to implement the developed system. Daily, weekly, monthly and/or yearly, period‐by‐period, and cumulative to‐date project performance reports are generated to provide the status at project, control object and resource levels. An example drawn from the literature is analysed to allow for comparison with the results obtained using the proposed methodology. The example also serves the purpose of demonstrating the use of the proposed system and illustrating its essential features.

[1]  C. William Ibbs,et al.  Systematic Automated Management Exception Reporting , 1993 .

[2]  H. N. Ahuja,et al.  Project management : techniques in planning and controlling construction projects / Hira N. Ahuja, S.P. Dozzi, S.M. Aourizk , 1994 .

[3]  Robert I. Carr COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION , 1993 .

[4]  A. Roy Duff,et al.  Development of Causal Model of Construction Accident Causation , 2001 .

[5]  Aminah Robinson Fayek,et al.  Automated Corrective Action Selection Assistant , 1994 .

[6]  Ting-Ya Hsieh,et al.  Impact of Subcontracting on Site Productivity: Lessons Learned in Taiwan , 1998 .

[7]  Osama Abudayyeh An automated data acquisition and data storage model for improving cost and schedule control , 1992 .

[8]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[9]  Terry Quatrani,et al.  Visual Modeling with Rational Rose 2002 and UML , 2002 .

[10]  J. K. Yates Construction Decision Support System for Delay Analysis , 1993 .

[11]  Ji Li Web-based integrated project control , 2004 .

[12]  Neil N. Eldin Measurement of Work Progress: Quantitative Technique , 1989 .

[13]  Michael Boggs,et al.  Mastering UML with Rational Rose 2002 , 2002 .

[14]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[15]  James E. Diekmann,et al.  SuperChange: Expert System for Analysis of Changes Claims , 1992 .

[16]  Jeffrey S. Russell,et al.  Impact of change orders on labor efficiency for electrical construction , 1999 .

[17]  Martin Fischer,et al.  Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .

[18]  Ashraf Elazouni,et al.  Evaluating the Performance of Construction Equipment Operators in Egypt , 1996 .

[19]  James E. Diekmann,et al.  Knowledge-based approach to construction project control , 1992 .

[20]  Sabah Alkass,et al.  Computer aided construction delay analysis and claims preparation , 1995 .

[21]  Alan D. Russell Computerized Daily Site Reporting , 1993 .

[22]  Samer Fuad Abu-Hijleh A model for variance-based exception reporting with user-defined criteria , 1992 .

[23]  Osama Abudayyeh,et al.  Prototype Integrated Cost and Schedule Control System , 1993 .

[24]  Daniel W. Halpin,et al.  COMPASS—New Paradigm for Project Cost Control Strategy and Planning , 1996 .