Multi-Agent-Based Production Planning and Control
暂无分享,去创建一个
[1] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[2] Jie Zhang,et al. An Available-to-Promise System for Network-Manufacturing , 2011 .
[3] S. Macchietto,et al. Minimizing the effects of batch process variability using online schedule modification , 1989 .
[4] Jie Zhang,et al. A Multi-Agent-Based Agile Shop Floor Control System , 2002 .
[5] Lihui Wu,et al. Agent based production planning and scheduling system for networked manufacturing system , 2010, 2010 8th International Conference on Supply Chain Management and Information.
[6] Gun Ho Lee,et al. Reconfigurability consideration design of components and manufacturing systems , 1997 .
[7] A. Tharumarajah,et al. Comparison of the bionic, fractal and holonic manufacturing system concepts , 1996 .
[8] Gintaras V. Reklaitis,et al. Reactive schedule modification in multipurpose batch chemical plants , 1994 .
[9] P. R. Kumar,et al. Re-entrant lines , 1993, Queueing Syst. Theory Appl..
[10] Kazuaki Iwata,et al. Random Manufacturing System: a New Concept of Manufacturing Systems for Production to Order , 1994 .
[11] A. Sherlock,et al. Biological analogies in manufacturing , 2000 .
[12] Charles A. Holloway,et al. Centralized Scheduling and Priority Implementation Heuristics for a Dynamic Job Shop Model , 1977 .
[13] Botond Kádár,et al. Hierarchy in distributed shop floor control , 2000 .
[14] Marc Gravel,et al. A review of optimisation models of Kanban-based production systems , 1994 .