Financial Risk Management in the Planning of Energy Recovery in the Total Site
暂无分享,去创建一个
[1] Jacek Jeżowski,et al. A new methodology for simultaneous optimization of capital and operating cost targets in heat exchanger network design , 2000 .
[2] S. Ahmad,et al. Heat recovery between areas of integrity , 1991 .
[3] Robert J. Vanderbei,et al. Robust Optimization of Large-Scale Systems , 1995, Oper. Res..
[4] Costas D. Maranas,et al. Market-based pollution abatement strategies: Risk management using emission option contracts , 2003 .
[5] Arthur White McCray,et al. Petroleum evaluations and economic decisions , 1975 .
[6] Miguel J. Bagajewicz,et al. Multiple plant heat integration in a total site , 2002 .
[7] Miguel J. Bagajewicz,et al. ACCOMPLISH PROFITABLE SAVINGS BY REALISTICALLY HEAT INTEGRATING A CRUDE FRACTIONATION UNIT AND AN FCC UNIT , 2000 .
[8] Miguel J. Bagajewicz,et al. Energy savings in the total site heat integration across many plants , 2000 .
[9] Efstratios N. Pistikopoulos,et al. Simultaneous incorporation of flexibility and economic risk in operational planning under uncertainty , 1994 .
[10] Miguel J. Bagajewicz,et al. Multipurpose Heat-Exchanger Networks for Heat Integration Across Plants , 2001 .
[11] Linus Schrage,et al. OR Practice - A Scenario Approach to Capacity Planning , 1989, Oper. Res..
[12] Bodo Linnhoff,et al. Total site targets for fuel, co-generation, emissions, and cooling , 1993 .
[13] Miguel J. Bagajewicz,et al. Targeting procedures for energy savings by heat integration across plants , 1999 .
[14] Alexander Shapiro,et al. The Sample Average Approximation Method Applied to Stochastic Routing Problems: A Computational Study , 2003, Comput. Optim. Appl..
[15] N. Sahinidis,et al. Optimization in Process Planning under Uncertainty , 1996 .
[16] Miguel J. Bagajewicz,et al. Managing financial risk in planning under uncertainty , 2004 .