Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system
暂无分享,去创建一个
[1] C L Doll,et al. AN ITERATIVE PROCEDURE FOR THE SINGLE-MACHINE, MULTI-PRODUCT LOT SCHEDULING PROBLEM : A WORKING PAPER , 1973 .
[2] Kyung S. Park,et al. A Stepwise partial enumeration algorithm for the economic lot scheduling problem , 1984 .
[3] Phillip L. Carter,et al. Supplier/Customer Inventory Relationships Under Just In Time , 1990 .
[4] Amiya K. Chakravarty,et al. Operational economies of a process positioning determinant , 1991, Comput. Oper. Res..
[5] Cengiz Yilmaz. Incremental order quantity for the case of very lumpy demand , 1992 .
[6] Mahmut Parlar,et al. A stochastic inventory problem with piecewise quadratic costs , 1992 .
[7] Avijit Banerjee. Production lot sizing with work-in-process considerations in response to periodic demand , 1992 .
[8] B. Sarker,et al. Economic manufacturing quantity in a just-in-time delivery system , 1992 .
[9] Bhaba R. Sarker,et al. An optimal batch size for a production system operating under a just-in-time delivery system , 1993 .
[10] Gyana R. Parija,et al. An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .