Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demand
暂无分享,去创建一个
Shi Tao Zhao | Xue-Ming Yuan | Kan Wu | Xue-Ming Yuan | Kan Wu | S. Zhao
[1] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[2] W. Zangwill. A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System---A Network Approach , 1969 .
[3] Gitae Kim,et al. Optimal inventory control in a multi-period newsvendor problem with non-stationary demand , 2015, Adv. Eng. Informatics.
[4] Katherinne Salas Navarro,et al. A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items , 2014, Appl. Math. Comput..
[5] M. Braglia,et al. Modelling an industrial strategy for inventory management in supply chains: The 'Consignment Stock' case , 2003 .
[6] A Diponegoro,et al. Operations policy for a supply chain system with fixed-interval delivery and linear demand , 2007, J. Oper. Res. Soc..
[7] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..
[8] R. Hill. Inventory Models for Increasing Demand Followed by Level Demand , 1995 .
[9] Shib Sankar Sana,et al. A production-inventory model in an imperfect production process , 2010, Eur. J. Oper. Res..
[10] Marshall L. Fisher,et al. Supply Chain Inventory Management and the Value of Shared Information , 2000 .
[11] Gérard P. Cachon,et al. Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations , 2005, Manag. Sci..
[12] Jingjing Xu,et al. Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties , 2014, Eur. J. Oper. Res..
[13] R. W. Grubbström,et al. A century of evolution from Harris׳s basic lot size model: Survey and research agenda , 2014 .
[14] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[15] M. Darwish,et al. The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..
[16] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[17] Horst Tempelmeier,et al. Dynamic capacitated lot-sizing problems: a classification and review of solution approaches , 2010, OR Spectr..
[18] Diego Klabjan,et al. Lead time considerations for the multi-level capacitated lot-sizing problem , 2015, Eur. J. Oper. Res..
[19] Boray Huang,et al. The effects of lumpy demand and shipment size constraint: A response to "Revisit the note on supply chain integration in vendor-managed inventory" , 2010, Decis. Support Syst..
[20] B. Sarker,et al. An operational consignment stock policy under normally distributed demand with controllable lead time and buyer’s space limitation , 2014 .
[21] Bernardo Almada-Lobo,et al. Lot sizing and scheduling: industrial extensions and research opportunities , 2011 .
[22] Boaz Golany,et al. A dynamic inventory model with supplier selection in a serial supply chain structure , 2013, Eur. J. Oper. Res..
[23] Bhaba R. Sarker,et al. Operations planning for a multi-stage kanban system , 1999, Eur. J. Oper. Res..
[24] Abhishek Chakraborty,et al. Joint replenishment of multi retailer with variable replenishment cycle under VMI , 2014, Eur. J. Oper. Res..
[25] C. Glock. The joint economic lot size problem: A review , 2012 .
[26] Ching-Ter Chang,et al. A seasonal demand inventory model with variable lead time and resource constraints , 2007 .
[27] Shib Sankar Sana,et al. $$(Q,r,L)$$(Q,r,L) model for stochastic demand with lead-time dependent partial backlogging , 2015, Ann. Oper. Res..
[28] Lucio Zavanella,et al. The consignment stock of inventories: industrial case and performance analysis , 2003 .
[29] Adolfo Crespo Marquez,et al. A Decision Support System for evaluating operations investments in high-technology business , 2006, Decis. Support Syst..
[30] Ralf W. Seifert,et al. Production , Manufacturing and Logistics Managing business dynamics with adaptive supply chain portfolios , 2011 .
[31] Ü. Gürler,et al. The dynamic lot-sizing problem with convex economic production costs and setups , 2014 .
[32] Xiaoming Liu,et al. Cost-effective inventory control in a value-added manufacturing system , 2009, Eur. J. Oper. Res..
[33] Wenyih Lee. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering , 2005 .
[34] Gintaras V. Reklaitis,et al. Integrated Planning and Optimization of Clinical Trial Supply Chain System with Risk Pooling , 2012 .
[35] M. Hariga. Optimal EOQ Models for Deteriorating Items with Time-Varying Demand , 1996 .
[36] Deng-Maw Tsai,et al. An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments , 2010, Eur. J. Oper. Res..
[37] Christoph H. Glock,et al. A multi-stage joint economic lot size model with lead time penalty costs , 2013, Comput. Ind. Eng..
[38] S. K. Goyal,et al. The production-inventory problem of a product with time varying demand, production and deterioration rates , 2003, Eur. J. Oper. Res..
[39] Ali H. Diabat. Hybrid algorithm for a vendor managed inventory system in a two-echelon supply chain , 2014, Eur. J. Oper. Res..
[40] Jen-Ming Chen,et al. Channel coordination under consignment and vendor-managed inventory in a distribution system , 2010 .
[41] M. A. Hoque,et al. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors , 2011, Eur. J. Oper. Res..
[42] Ronald L. Rivest,et al. Introduction to Algorithms , 1990 .
[43] Ruhul A. Sarker,et al. A just-in-time three-level integrated manufacturing system for linearly time-varying demand process , 2013 .
[44] Philip M. Kaminsky,et al. Production and Distribution Lot Sizing in a Two Stage Supply Chain , 2003 .
[45] Albert P. M. Wagelmans,et al. Integrated Lot Sizing in Serial Supply Chains with Production Capacities , 2005, Manag. Sci..
[46] Stéphane Dauzère-Pérès,et al. Single item lot sizing problems , 2006, Eur. J. Oper. Res..
[47] Qi-Ming He,et al. Modeling and analysis of a supply-assembly-store chain , 2007, Eur. J. Oper. Res..
[48] Kan Wu,et al. Optimal integer-ratio inventory coordination policy for an integrated multi-stage supply chain , 2016 .
[49] Bhaba R. Sarker,et al. Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers , 2009, Eur. J. Oper. Res..
[50] Ching-Ter Chang,et al. A coordination system for seasonal demand problems in the supply chain , 2013 .
[51] Edward A. Silver,et al. A Simple Inventory Replenishment Decision Rule for a Linear Trend in Demand , 1979 .
[52] Chih-Hung Tsai,et al. Exact solution of inventory replenishment policy for a linear trend in demand - two-equation model , 2002 .
[53] Hsin Rau,et al. An optimal batch size for integrated production-inventory policy in a supply chain , 2008, Eur. J. Oper. Res..
[54] D. Towill,et al. The impact of product life cycle on supply chain strategy , 2003 .
[55] Wilco van den Heuvel,et al. The economic lot-sizing problem with perishable items and consumption order preference , 2015, Eur. J. Oper. Res..
[56] Hark-Chin Hwang,et al. Basis Paths and a Polynomial Algorithm for the Multistage Production-Capacitated Lot-Sizing Problem , 2013, Oper. Res..
[57] S. Sana,et al. A three layer multi-item production–inventory model for multiple suppliers and retailers , 2012 .
[58] J. Teng,et al. Economic order quantity model with trade credit financing for non-decreasing demand , 2012 .