Availability optimisation for stochastic degrading systems under imperfect preventive maintenance

This paper deals with imperfect preventive maintenance (PM) optimisation problem. The system to be maintained is typically a production system assumed to be continuously monitored and subject to stochastic degradation. To assess such degradation, the proposed maintenance model takes into account both corrective maintenance (CM) and PM. The system undergoes PM whenever its reliability reaches an appropriate value, while CM is performed at system failure. After a given number of maintenance actions, the system is preventively replaced by a new one. Both CM as well as PM are considered imperfect, i.e. they bring the system to an operating state which lies between two extreme states, namely the as bad as old state and as good as new state. The imperfect effect of CM and PM is modelled on the basis of the hybrid hazard rate model. The objective of the proposed PM optimisation model consists on finding the optimal reliability threshold together with the optimal number of PM actions to maximise the average availability of the system. A mathematical model is then proposed. To solve this problem an algorithm is provided. A numerical example is presented to illustrate the proposed maintenance optimisation model.

[1]  Tangbin Xia,et al.  Modeling and optimizing maintenance schedule for energy systems subject to degradation , 2012, Comput. Ind. Eng..

[2]  T. Nakagawa Sequential imperfect preventive maintenance policies , 1988 .

[3]  Fuzhang Zhao Weighting factors for single-step trapezoidal method , 2006 .

[4]  Toshio Nakagawa,et al.  A summary of maintenance policies for a finite interval , 2009, Reliab. Eng. Syst. Saf..

[5]  Mark Waters,et al.  A Sequential Approach for Gas Turbine Power Plant Preventative Maintenance Scheduling , 2006 .

[6]  Xiaojun Zhou,et al.  Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation , 2007, Reliab. Eng. Syst. Saf..

[7]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[8]  Ming J. Zuo,et al.  Sequential imperfect preventive maintenance models with two categories of failure modes , 2001 .

[9]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[10]  Sami El-Ferik,et al.  Age-based hybrid model for imperfect preventive maintenance , 2006 .

[11]  Andrew K. S. Jardine,et al.  Maintenance, Replacement, and Reliability: Theory and Applications, Second Edition , 2013 .

[12]  Lin Ma,et al.  A practical approach for reliability prediction of pipeline systems , 2009, Eur. J. Oper. Res..

[13]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[14]  W. Wang A model to determine the optimal critical level and the monitoring intervals in condition-based maintenance , 2000 .

[15]  Vitali Volovoi,et al.  A Sequential Approach for Gas Turbine Power Plant Preventive Maintenance Scheduling , 2005 .

[16]  S. Rahman Reliability Engineering and System Safety , 2011 .

[17]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[18]  Mazhar Ali Khan Malik,et al.  Reliable Preventive Maintenance Scheduling , 1979 .

[19]  Toshio Nakagawa Advanced Reliability Models and Maintenance Policies , 2008 .

[20]  D. N. Prabhakar Murthy,et al.  Optimal Preventive Maintenance Policies for Repairable Systems , 1981, Oper. Res..

[21]  Xiaoyue Jiang,et al.  Optimizing the performance of a repairable system under a maintenance and repair contract , 2007, Qual. Reliab. Eng. Int..

[22]  Ming J. Zuo,et al.  General sequential imperfect preventive maintenance models , 2000 .

[23]  Lifeng Xi,et al.  Preventive maintenance scheduling for repairable system with deterioration , 2010, J. Intell. Manuf..