Produção enxuta e teoria das restrições: proposta de um método para implantação conjunta na Indústria de Bens de Capital sob Encomenda

The task of developing and managing production systems has become increasingly complex over the years, and currently, in order to face customers' changing demands and global competition, managers have the difficult task of combining mass production efficiency with customization of pre-industrial craft production era. Accordingly, the enterprises in the Engineer-to-Order (ETO) Capital Goods Industry are exposed to very adverse market conditions and have pursued modern production management strategies to improve production flow and minimize the drawbacks inherent to their production systems. This study investigates ETO Capital Goods Industry, also known as large assembly manufacturing system, aiming to propose a method for the joint implementation of lean manufacturing principles and theory of constraints using appropriate Ordering Systems to reduce production lead time and increase delivery dependability.

[1]  Jannes Slomp,et al.  A lean production control system for high-variety/low-volume environments: a case study implementation , 2009 .

[2]  P. V. Mohanram,et al.  A survey on lean practices in Indian machine tool industries , 2011 .

[3]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[4]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[5]  Richard Lee Storch,et al.  Improving flow to achieve lean manufacturing in shipbuilding , 1999 .

[6]  D. Coghlan,et al.  Action research for operations management , 2002 .

[7]  David Little,et al.  Integrated planning and scheduling in the engineer-to-order sector , 2000, Int. J. Comput. Integr. Manuf..

[8]  Roberto dos Reis Alvarez,et al.  Takt-time: conceitos e contextualização dentro do Sistema Toyota de Produção , 2001 .

[9]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[10]  Jay Jina,et al.  Applying lean principles for high product variety and low volumes: some issues and propositions , 1997 .

[11]  Linda Hendry,et al.  Applying world class manufacturing to make‐to‐order companies: problems and solutions , 1998 .

[12]  Li Ma,et al.  Operation and control of flow manufacturing based on constraints management for high-mix/low-volume production , 2008 .

[13]  Chih-Hung Tsai,et al.  Research on enhancement of TOC Simplified Drum-Buffer-Rope system using novel generic procedures , 2010, Expert Syst. Appl..

[14]  Satya S. Chakravorty,et al.  An evaluation of the DBR control mechanism in a job shop environment , 2001 .

[15]  B. G. Dale,et al.  Lean production: A study of application in a traditional manufacturing environment , 2000 .

[16]  Victor R. Prybutok,et al.  The relationship between JIT practices and type of production system , 2001 .

[17]  Bart L. MacCarthy,et al.  A multi-dimensional classification of production systems for the design and selection of production planning and control systems , 2000 .

[18]  A. Graves,et al.  Implementing Lean in aerospace-challenging the assumptions and understanding the challenges , 2003 .

[19]  Hokey Min,et al.  TOC-based performance measures and five focusing steps in a job-shop manufacturing environment , 2002 .