Risk assessment of international construction projects using the analytic network process

In this study, an analytic network process (ANP), which can handle the interrelations between risk related factors, is proposed as a reliable technique for measuring the level of risk associated with international construction projects. Within this context, ANP is used to derive the relative priorities of risk factors as an input to a decision support tool, which can be utilized during bidding decisions. The decision support tool may help a decision maker to estimate the level of risk so that alternative projects may be ranked with respect to their risk levels and appropriate contingency values may be defined after a bid decision is given. The tool has a database in which risk information of the rated projects can be stored for future use. The reliability of the tool was tested on eight real cases and satisfactory results were achieved in estimating the risk level.

[1]  Semra Comu,et al.  Dual Impact of Cultural and Linguistic Diversity on Project Network Performance , 2011 .

[2]  Irem Dikmen,et al.  A case-based decision support tool for bid mark-up estimation of international construction projects , 2007 .

[3]  Beliz Ozorhon,et al.  Using Analytic Network Process to Predict the Performance of International Construction Joint Ventures , 2007 .

[4]  Irem Dikmen,et al.  Using fuzzy risk assessment to rate cost overrun risk in international construction projects , 2007 .

[5]  Beliz Ozorhon,et al.  Project appraisal and selection using the analytic network process , 2007 .

[6]  D. Hillson The risk management universe: A guided tour , 2007 .

[7]  Gwo-Hshiung Tzeng,et al.  A soft computing method for multi-criteria decision making with dependence and feedback , 2006, Appl. Math. Comput..

[8]  Irem Dikmen,et al.  An analytic hierarchy process based model for risk and opportunity assessment of international construction projects , 2006 .

[9]  D. Hillson,et al.  Managing Risk Attitude using Emotional Literacy , 2006 .

[10]  T. Raz,et al.  A Comparative Review of Risk Management Standards , 2005 .

[11]  Raymond E. Levitt,et al.  UNDERSTANDING AND MITIGATING CHALLENGES ON GLOBAL PROJECTS: THE ROLE OF THE FREELANCE EXPATRIATE , 2005 .

[12]  David Arditi,et al.  International Expansion Decision for Construction Companies , 2005 .

[13]  Thomas L. Saaty,et al.  Theory and Applications of the Analytic Network Process: Decision Making With Benefits, Opportunities, Costs, and Risks , 2005 .

[14]  Ruth Murray-Webster,et al.  Understanding and Managing Risk Attitude , 2005 .

[15]  Wen Lea Pearn,et al.  Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .

[16]  Heng Li,et al.  Analytic network process applied to project selection , 2005 .

[17]  David Arditi,et al.  Factors Affecting International Construction , 2005 .

[18]  Seung Heon Han,et al.  Contractor’s Risk Attitudes in the Selection of International Construction Projects , 2005 .

[19]  Beliz Ozorhon,et al.  Organizational memory formation and its use in construction , 2005 .

[20]  Heng Li,et al.  Contractor selection using the analytic network process , 2004 .

[21]  Seung Heon Han,et al.  Multicriteria Financial Portfolio Risk Management for International Projects , 2004 .

[22]  M. Dulaimi,et al.  Risk management framework for construction projects in developing countries , 2004 .

[23]  Irem Dikmen,et al.  Neural Network Model to Support International Market Entry Decisions , 2004 .

[24]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[25]  Motives for choosing a currency in international business , 2004 .

[26]  S. Mohamed Performance in International Construction Joint Ventures: Modeling Perspective , 2003 .

[27]  Jizhong Zhu,et al.  Optimal generation scheduling based on AHP/ANP , 2003, IEEE Trans. Syst. Man Cybern. Part B.

[28]  David Hillson,et al.  Using a Risk Breakdown Structure in project management , 2003 .

[29]  Sevin Sozer,et al.  Product planning in quality function deployment using a combined analytic network process and goal programming approach , 2003 .

[30]  Adrien Presley,et al.  R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.

[31]  Chris Hendrickson,et al.  EXCHANGE RATE RISK MANAGEMENT IN INTERNATIONAL CONSTRUCTION VENTURES , 2001 .

[32]  N. Kartam,et al.  Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .

[33]  Seung Heon Han,et al.  Approaches for Making Risk-Based Go/No-Go Decision for International Projects , 2001 .

[34]  Özlem Öz,et al.  Sources of competitive advantage of Turkish construction companies in international markets , 2001 .

[35]  Ali Jaafari,et al.  Management of risks, uncertainties and opportunities on projects: time for a fundamental shift , 2001 .

[36]  Soung Hie Kim,et al.  Using analytic network process and goal programming for interdependent information system project selection , 2000, Comput. Oper. Res..

[37]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[38]  Svetlana. Cicmil,et al.  RAMP: Risk Analysis and Management for Projects , 1999 .

[39]  Li Bing,et al.  Risk management model for international construction joint ventures , 1999 .

[40]  Scott Baker,et al.  Survey of Risk Management in Major U.K. Companies , 1999 .

[41]  Gary R. Smith,et al.  Small to Medium Contractor Contingency and Assumption of Risk , 1999 .

[42]  Mark D. Fleming,et al.  When is a risk not a risk , 1999 .

[43]  Chris Chapman,et al.  Project risk analysis and management - PRAM the generic process , 1997 .

[44]  J. Crisp,et al.  The Delphi method? , 1997, Nursing research.

[45]  Simaan M. AbouRizk,et al.  UTILITY-THEORY MODEL FOR BID MARKUP DECISIONS , 1996 .

[46]  Campbell R. Harvey,et al.  Political Risk, Economic Risk and Financial Risk , 1996 .

[47]  Leslie Edwards Practical Risk Management in the Construction Industry , 1996 .

[48]  Stephen D. Schuette,et al.  Building construction estimating , 1994 .

[49]  John Raftery,et al.  Risk Analysis in Project Management , 1993 .

[50]  Roger Flanagan,et al.  Risk Management and Construction , 1993 .

[51]  Irtishad Ahmad Decision‐Support System for Modeling Bid/No‐Bid Decision Problem , 1990 .

[52]  David B. Ashley,et al.  Political Risks in International Construction , 1987 .

[53]  Howard Thomas,et al.  Risk analysis and its applications , 1983 .

[54]  Boyd C. Paulson,et al.  Professional Construction Management , 1978 .

[55]  R. Brodie Institution of Civil Engineers , 1946, Nature.