Solution of Chance Constrained Programming Problem for Multi-Objective Interval Solid Transportation Problem under Stochastic Environment using Fuzzy Approach

ABSTRACT In this paper, a solution procedure has been given for the Chance Constrained Programming Models For Multi-Objective Interval Solid Transportation Problem under stochastic environment (MOISTP) where the cost coefficients of the objective functions, the source availability, destination demand and conveyance capacities have been taken as stochastic intervals by the decision makers. The problem has been transformed into a classical multi-objective transportation problem where the multiple objective functions are minimized by using fuzzy programming approach. Numerical examples are provided to illustrate the approach

[1]  Yian-Kui Liu,et al.  Expected value of fuzzy variable and fuzzy expected value models , 2002, IEEE Trans. Fuzzy Syst..

[2]  G. Alefeld,et al.  Introduction to Interval Computation , 1983 .

[3]  M. Gen,et al.  Solving bicriteria solid transportation problem with fuzzy numbers by a genetic algorithm , 1995 .

[4]  A. Goswami,et al.  Multiobjective transportation problem with interval cost, source and destination parameters , 1999, Eur. J. Oper. Res..

[5]  Baoding Liu,et al.  Theory and Practice of Uncertain Programming , 2003, Studies in Fuzziness and Soft Computing.

[6]  Ramon E. Moore Methods and applications of interval analysis , 1979, SIAM studies in applied mathematics.

[7]  Abraham Charnes,et al.  Chance Constraints and Normal Deviates , 1962 .

[8]  H. Leberling On finding compromise solutions in multicriteria problems using the fuzzy min-operator , 1981 .

[9]  M. Inuiguchi,et al.  Goal programming problems with interval coefficients and target intervals , 1991 .

[10]  Tong Shaocheng,et al.  Interval number and fuzzy number linear programmings , 1994 .

[11]  Lixing Yang,et al.  A bicriteria solid transportation problem with fixed charge under stochastic environment , 2007 .

[12]  A. Charnes,et al.  Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints , 1963 .

[13]  Baoding Liu,et al.  Chance constrained programming with fuzzy parameters , 1998, Fuzzy Sets Syst..

[14]  José L. Verdegay,et al.  Solving fuzzy solid transportation problems by an evolutionary algorithm based parametric approach , 1999, Eur. J. Oper. Res..

[15]  H. Zimmermann Fuzzy programming and linear programming with several objective functions , 1978 .

[16]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[17]  M. Gen,et al.  Improved Genetic Algorithm for Solving Multiobjective Solid Transportation Problem with Fuzzy Numbers , 1997 .

[18]  M. P. Biswal,et al.  Fuzzy programming approach to multiobjective solid transportation problem , 1993 .

[19]  Fernando Jiménez,et al.  Uncertain solid transportation problems , 1998, Fuzzy Sets Syst..

[20]  H. Ishibuchi,et al.  Multiobjective programming in optimization of the interval objective function , 1990 .

[21]  Lixing Yang,et al.  Fuzzy fixed charge solid transportation problem and algorithm , 2007, Appl. Soft Comput..

[22]  Mitsuo Gen,et al.  Neural network approach for multicriteria solid transportation problem , 1997 .

[23]  Mitsuo Gen,et al.  Improved Genetic Algorithm for Solving Multiobjective Solid Transportation Problem with Fuzzy Numbers , 1997 .

[24]  Marco Furini,et al.  International Journal of Computer and Applications , 2010 .

[25]  Ralph E. Steuer Algorithms for Linear Programming Problems with Interval Objective Function Coefficients , 1981, Math. Oper. Res..