Offsite Manufacturing in the Construction Industry for Productivity Improvement

Abstract Offsite manufacturing (OSM) is believed to be an alternative means of improving construction productivity. However, OSM has attracted limited attention from researchers and industry stakeholders, particularly in developing countries. Therefore, this study considers the key factors hindering the industry-wide adoption of OSM in the Cambodian context. A survey conducted with 75 construction practitioners asked respondents to quantify the level of influence from 30 constraints pertaining to OSM. Multi-attribute utility and correlation coefficient analyses were used to statistically analyze the data. Six broad categories of constraints to adopting OSM underlie the challenges facing the local industry: project planning and methodology, construction cost, construction industry and culture, skill and shortage, supply chain and logistics, and construction site operations. The findings may be useful for construction engineering professionals seeking ways to improve construction productivity performance by implementing OSM as an alternative technique in developing countries.

[1]  Mohd Sapuan Salit,et al.  The essential characteristics of industrialised building system , 2003 .

[2]  B. Feldman,et al.  Defining consensus: a systematic review recommends methodologic criteria for reporting of Delphi studies. , 2014, Journal of clinical epidemiology.

[3]  Alistair G.F. Gibb,et al.  Considerations for assessing the benefits of standardisation and pre-assembly in construction , 2002 .

[4]  Andrew R.J. Dainty,et al.  Perspectives of UK housebuilders on the use of offsite modern methods of construction , 2007 .

[5]  Perry R. Hinton SPSS Explained , 2004 .

[6]  Charles B. Brown,et al.  Transformation From Batch to Lean Manufacturing: The Performance Issues , 2006 .

[7]  Syuhaida Ismail,et al.  Role of the construction industry in economic development of Turkmenistan , 2012 .

[8]  Alistair G.F. Gibb,et al.  Future opportunities for offsite in the UK , 2007 .

[9]  Bimal Nepal,et al.  Lean Implementation and Organizational Transformation: A Literature Review , 2017 .

[10]  Alistair G.F. Gibb,et al.  Leading UK housebuilders' utilization of offsite construction methods , 2008 .

[11]  C. M. Tam,et al.  Cutting Construction Wastes by Prefabrication , 2006 .

[12]  Jasper Mbachu,et al.  Marginal Productivity Gained Through Prefabrication: Case Studies of Building Projects in Auckland , 2015 .

[13]  Heng Li,et al.  Rethinking prefabricated construction management using the VP‐based IKEA model in Hong Kong , 2011 .

[14]  Sherif Ali Mohtady Mohamed,et al.  Key Factors Affecting Construction Safety Performance in Developing Countries: Evidence from Cambodia , 2017 .

[15]  Ron Wakefield,et al.  Drivers, constraints and the future of offsite manufacture in Australia , 2007 .

[16]  Andrews S. Chang,et al.  Nature of Construction Technology , 2004 .

[17]  Chi Sun Poon,et al.  Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .

[18]  R. Kenley Productivity improvement in the construction process , 2014 .

[19]  C S Poon,et al.  Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.

[20]  Syuhaida Ismail,et al.  The build-operate-transfer model as an infrastructure privatisation strategy for Turkmenistan , 2017 .

[21]  Simaan M. AbouRizk,et al.  A framework for an automated and integrated project monitoring and control system for steel fabrication projects , 2011 .

[22]  Steven E. Stemler,et al.  An Overview of Content Analysis. , 2001 .

[23]  Jasper Mbachu,et al.  Prefabrication as an onsite productivity enhancer: analysis of impact levels of the underlying constraints and improvement measures in New Zealand construction industry , 2013 .

[24]  Marta Gangolells,et al.  Mitigating construction safety risks using prevention through design. , 2010, Journal of safety research.

[25]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[26]  A. Dainty,et al.  Leading UK housebuilders' utilisation of offsite modern methods of construction , 2018 .

[27]  S. Durdyev,et al.  Causes of delay in residential construction projects in Cambodia , 2017 .

[28]  M. Arif,et al.  Making a case for offsite construction in China , 2010 .

[29]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[30]  Thais da C. L. Alves,et al.  Supplier Quality Management Inside and Outside the Construction Industry , 2015 .

[31]  Syuhaida Ismail,et al.  Structural Equation Model of the Factors Affecting Construction Labor Productivity , 2018 .

[32]  Alistair G.F. Gibb,et al.  Standardization and pre-assembly- distinguishing myth from reality using case study research , 2001 .

[33]  Vivian W. Y Tam,et al.  Towards adoption of prefabrication in construction , 2007 .

[34]  Ehsan Gharaie,et al.  Examining the Drivers and States of Organizational Change for Greater Use of Prefabrication in Construction Projects , 2017 .

[35]  M. Tavakol,et al.  Making sense of Cronbach's alpha , 2011, International journal of medical education.

[36]  Wafaa Nadim,et al.  Offsite production: a model for building down barriers: A European construction industry perspective , 2011 .

[37]  Steven E. Stemler,et al.  An overview of content analysis , 2003 .

[38]  S. Durdyev,et al.  Key constraints to labour productivity in residential building projects: evidence from Cambodia , 2018 .

[39]  Vivian W. Y Tam,et al.  Use of Prefabrication to Minimize Construction Waste - A Case Study Approach , 2005 .

[40]  Alistair G.F. Gibb,et al.  Re-engineering through pre-assembly: client expectations and drivers , 2003 .

[41]  B. Onwuteaka-Philipsen,et al.  Reducing questionnaire length did not improve physician response rate: a randomized trial. , 2014, Journal of clinical epidemiology.

[42]  David. Proverbs,et al.  The performance of contractors in Japan, the UK and the USA , 2002 .

[43]  Derek Thurnell,et al.  The construction client satisfaction model: a PLS-SEM approach , 2018 .

[44]  Main Factors Causing Delays in Large Construction Projects: Evidence from New Zealand , 2017 .

[45]  David R. Riley,et al.  Sustainable performance criteria for construction method selection in concrete buildings , 2010 .

[46]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[47]  Amm Liu,et al.  Research Methods for Construction (3rd ed.) , 2008 .

[48]  Jack Steven Goulding,et al.  Offsite Manufacturing Construction: A Big Opportunity for Housing Delivery in Nigeria , 2014 .

[49]  Kathleen M. Carley Coding Choices for Textual Analysis: A Comparison of Content Analysis and Map Analysis , 1993 .

[50]  Pamela Bell,et al.  Kiwi Prefab: Prefabricated Housing in New Zealand: an Historical and Contemporary Overview with Recommendations for the Future , 2009 .

[51]  Christine Wall,et al.  Craft versus industry: the division of labour in European housing construction , 2000 .

[52]  Fereydoun Aghazadeh,et al.  Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA , 2008 .

[53]  S. Durdyev,et al.  Construction Productivity in Turkmenistan: Survey of the Constraining Factors , 2013 .

[54]  Hamza Khan,et al.  Study on the Trends & Usage of Prefabrication and Modularization: Increasing Productivity in the Construction Industry , 2017 .

[55]  M A Shahawy,et al.  PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS TO LIMIT TRAFFIC DISRUPTION DURING CONSTRUCTION , 2003 .

[56]  Anil Sawhney,et al.  Analysing factors affecting delays in Indian construction projects , 2012 .

[57]  Jasper Mbachu,et al.  On-Site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures , 2011 .

[58]  N Blismas,et al.  Off-site manufacture in Australia: Current state and future directions , 2007 .

[59]  Malik M.A. Khalfan,et al.  Current State of Off-Site Manufacturing in Australian and Chinese Residential Construction , 2014 .

[60]  Peter Hoonakker,et al.  Barriers and benefits of quality management in the construction industry: An empirical study , 2010 .