Strategic Behavior, Workload, and Performance in Task Scheduling
暂无分享,去创建一个
[1] W. E. Hick. Quarterly Journal of Experimental Psychology , 1948, Nature.
[2] N Moray,et al. Where is capacity limited? A survey and a model. , 1967, Acta psychologica.
[3] A. Welford. Single-channel operation in the brain. , 1967, Acta psychologica.
[4] J. M. Moore. An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs , 1968 .
[5] B B Morgan,et al. Engineering Psychology and Human Performance , 1976 .
[6] Warren F. Clement,et al. Defining and Measuring Perceptual-Motor Workload in Manual Control Tasks , 1979 .
[7] Donald L. Parks,et al. Current Workload Methods and Emerging Challenges , 1979 .
[8] Thomas B. Sheridan,et al. Dynamic Decisions and Work Load in Multitask Supervisory Control , 1980, IEEE Transactions on Systems, Man, and Cybernetics.
[9] N. Moray. Subjective Mental Workload , 1982 .
[10] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[11] S. Hart,et al. Development of NASA-TLX (Task Load Index): Results of Empirical and Theoretical Research , 1988 .
[12] Penelope M. Sanderson,et al. The Human Planning and Scheduling Role in Advanced Manufacturing Systems: An Emerging Human Factors Domain , 1989 .
[13] C. Wickens. Engineering psychology and human performance, 2nd ed. , 1992 .
[14] N. Moray,et al. A simulation study of human performance deterioration and mental workload , 1993 .