Cementing horizontal wells in preparation for stimulation

This article is written with the assumption that a horizontal well will eventually be fractured or otherwise stimulated, and perhaps worked over; therefore control of the entire wellbore is desired. With wellbore control a requirement, the objective is to cement casing over the extend of the horizontal section. This procedure is discussed here.