A DISCRETE PRODUCTION SWITCHING RULE FOR AGGREGATE PLANNING

Aggregate planning (AP) is a necessary activity for manufacturing and services alike. A shift toward high-volume batch and continuous flow processes within American manufacturing has given rise to increasing numbers of crew-loaded facilities. A majority of AP approaches incorporate continuous decision variables and require frequent adjustments to both production and work-force settings. Despite the availability and diversity of these approaches, few significant applications have been reported. This paper presents the detailed development of a discrete AP switching rule that can be applied to a variety of cost environments. Inventory costs are estimated using an interval approach rather than traditional point estimates. The model allows incorporation of overtime options and is interactive in nature. Decision variables from the model can be disaggregated and linked directly to lower-level planning activities. Actual results of model implementation are reported. An overview of the model's incorporation into the larger context of hierarchical production planning is found in [21].

[1]  Roger C. Vergin,et al.  Note-On A New Look at Production Switching Heuristics for the Aggregate Planning Problem , 1980 .

[2]  Edward A. Silver,et al.  A Tutorial on Production Smoothing and Work Force Balancing , 1967, Oper. Res..

[3]  Daniel Orr,et al.  A Random Walk Production-Inventory Policy: Rationale and Implementation , 1962 .

[4]  Richard F. Deckro,et al.  Goal Programming Approaches to Solving Linear Decision Rule Based Aggregate Production Planning Models , 1984 .

[5]  David A. Goodman,et al.  A SECTIONING SEARCH APPROACH TO AGGREGATE PLANNING OF PRODUCTION AND WORK FORCE , 1974 .

[6]  E. H. Bowman Production Scheduling by the Transportation Method of Linear Programming , 1956 .

[7]  W. Clay Hamner,et al.  A COMPARISON OF ALTERNATIVE PRODUCTION MANAGEMENT COEFFICIENT DECISION RULES , 1975 .

[8]  S. Eilon Five Approaches to Aggregate Production Planning , 1975 .

[9]  Howard E. Thompson,et al.  The Effect of Worker Productivity on Production Smoothing , 1968 .

[10]  Joseph M. Mellichamp,et al.  Production Switching Heuristics for the Aggregate Planning Problem , 1978 .

[11]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[12]  Basheer M. Khumawala,et al.  Simulation Testing of Aggregate Production Planning Models in an Implementation Methodology , 1974 .

[13]  Samuel Eilon,et al.  A new approach to production smoothing , 1974 .

[14]  R. Ebert Aggregate Planning with Learning Curve Productivity , 1976 .

[15]  M. Palmer Terrell,et al.  Aggregate planning models incorporating productivity—an overview , 1982 .

[16]  Sidney W. Hess,et al.  A Linear Programming Approach to Production and Employment Scheduling , 1960 .

[17]  K. Arrow,et al.  Optimal Inventory Policy. , 1951 .

[18]  Wlodzimierz Szwarc,et al.  A Transportation Type Aggregate Production Model with Backordering , 1983 .

[19]  E. H. Bowman Consistency and Optimality in Managerial Decision Making , 1963 .

[20]  Curtis H. Jones Parametric Production Planning , 1967 .

[21]  Behrokh Khoshnevis,et al.  An Aggregate Production Planning Model Incorporating Dynamic Productivity: Part II. Solution Methodology and Analysis , 1983 .

[22]  C. C. Holt,et al.  A Linear Decision Rule for Production and Employment Scheduling , 1955 .

[23]  Behrokh Khoshnevis,et al.  An Aggregate Production Planning Model Incorporating Dynamic Productivity: Part I. Model Development , 1983 .

[24]  Terry R. Rakes,et al.  Aggregate production planning using chance-constrained goal programming , 1984 .

[25]  W. Taubert A Search Decision Rule for the Aggregate Scheduling Problem , 1968 .

[26]  Michael D. Oliff,et al.  Multiproduct Production Scheduling at Owens-Corning Fiberglas , 1985 .