A theoretical framework for classifying project complexity at the preconstruction stage using cluster analysis techniques

PurposeThe accuracy and reliability of subjectively assessing a construction project's complexity at the pre-construction stage is questionable and relies upon the project manager's tacit experiences, knowledge and background. The purpose of this paper is to develop a scientifically robust analytical approach by presenting a novel classification mechanism for defining the level of project complexity in terms of work contents (WCs), scope, building structures (BSs) and site conditions.Design/methodology/approachEmpiricism is adopted to deductively analyze variables obtained from secondary data within extant literature and primary project data to develop project type classifications. Specifically, and from an operational perspective, a two-stage “waterfall process” was adopted. In stage one, the research identified 56 variables affecting project complexity from literature and utilized a structured questionnaire survey of 100 project managers to measure the relevance of these. A total of 27 variables were revealed to be significant and exploratory factor analysis (EFA) is adopted to cluster these variables into six-factor thematic groups. In stage two, data from 62 real-life projects (including the layout and structural plans) were utilized for computing the factor score using the six-factor groups. Finally, hierarchical cluster analysis (HCA) is adopted to classify the projects into collected distinctive groups and each of a similar nature and characteristics.FindingsThe developed theoretical framework (that includes a novel complex index) provides a robust “blueprint platform” for main contractors to compile their project complexity database. The research outputs enable project managers to generate a more accurate picture of complexity at the pre-construction stage.Originality/valueWhile numerous research articles have provided a comprehensive framework to define project complexity, scant empirical works have assessed it at the pre-construction stage or utilized real-life project samples to classify it. This research addresses this knowledge gap within the prevailing body of knowledge.

[1]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[2]  Mohan M. Kumaraswamy,et al.  A study of the factors affecting construction durations in Hong Kong , 1995 .

[3]  Erika Parn,et al.  Digitalising asset management: concomitant benefits and persistent challenges , 2018 .

[4]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[5]  Carl T. Haas,et al.  Strategic Management of Human Resources in Construction , 2006 .

[6]  Lan Luo,et al.  Investigating the Relationship between Project Complexity and Success in Complex Construction Projects , 2017 .

[7]  Abdulmaten Taroun,et al.  Towards a better modelling and assessment of construction risk: Insights from a literature review , 2014 .

[8]  Ludovic-Alexandre Vidal,et al.  Understanding project complexity: implications on project management , 2008, Kybernetes.

[9]  John Haymaker,et al.  Relationships Between Project Complexity and Communication , 2011 .

[10]  Hongli Wang,et al.  Measurement model of project complexity for large-scale projects from task and organization perspective , 2015 .

[11]  Onur Behzat Tokdemir,et al.  Scheduling system for high rise building construction , 2002 .

[12]  Oko John Ameh,et al.  STUDY OF RELATIONSHIP BETWEEN TIME OVERRUN AND PRODUCTIVITY ON CONSTRUCTION SITES , 2011 .

[13]  David J. Edwards,et al.  Risk of excavators overturning , 2019, Engineering, Construction and Architectural Management.

[14]  Alex Gorod,et al.  Clarifying the project complexity construct: Past, present and future , 2016 .

[15]  Amy S. Beavers,et al.  Practical Considerations for Using Exploratory Factor Analysis in Educational Research. , 2013 .

[16]  Saed M Abdou,et al.  Project Complexity Influence on Project management performance – The Malaysian perspective , 2016 .

[17]  Rodney Turner,et al.  A model of project complexity : distinguishing dimensions of complexity from severity , 2009 .

[18]  Jim Freeman,et al.  The Influence of Experience and Information Search Styles on Project Risk Identification Performance , 2007, IEEE Transactions on Engineering Management.

[19]  Mohan M. Kumaraswamy,et al.  An evaluation of construction time performance in the building industry , 1996 .

[20]  Robert Cudeck,et al.  Exploratory Factor Analysis , 2000 .

[21]  Terry Williams,et al.  Identifying Success Factors in Construction Projects: A Case Study , 2016 .

[22]  Per Erik Eriksson,et al.  Effects of cooperative procurement procedures on construction project performance: A conceptual framework , 2011 .

[23]  Hannah Wood,et al.  Factors of complexity in construction projects , 2009 .

[24]  D. Proverbs,et al.  Factors influencing the culture of a construction project organisation: An empirical investigation , 2009 .

[25]  Sylvain Dejean,et al.  The interaction between reputation and information search: Evidence of information avoidance and confirmation bias , 2020 .

[26]  Peter E.D. Love,et al.  Dynamic Modeling of Workforce Planning for Infrastructure Projects , 2016 .

[27]  R. Henson,et al.  Use of Exploratory Factor Analysis in Published Research , 2006 .

[28]  Patrick T.I. Lam,et al.  Constructability rankings of construction systems based on the analytical hierarchy process , 2007 .

[29]  Stuart D. Anderson,et al.  Exploring and Assessing Project Complexity , 2017 .

[30]  Per Hilletofth,et al.  Managing supply chain risks and delays in construction project , 2018, Ind. Manag. Data Syst..

[31]  Ludovic-Alexandre Vidal,et al.  Using a Delphi process and the Analytic Hierarchy Process (AHP) to evaluate the complexity of projects , 2011, Expert Syst. Appl..

[32]  David J. Edwards,et al.  Industry 4.0 deployment in the construction industry: a bibliometric literature review and UK-based case study , 2020 .

[33]  Alexander Verbraeck,et al.  Grasping project complexity in large engineering projects: The TOE (Technical, Organizational and Environmental) framework , 2011 .

[34]  Ahmed W. A. Hammad,et al.  A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models , 2020, Construction Management and Economics.

[35]  Nicholas Chileshe,et al.  A field survey of hand–arm vibration exposure in the UK utilities sector , 2020 .

[36]  David Baccarini,et al.  The concept of project complexity—a review , 1996 .

[37]  Long D. Nguyen,et al.  Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process , 2015 .

[38]  Albert P.C. Chan,et al.  Measuring the complexity of mega construction projects in China—A fuzzy analytic network process analysis , 2015 .

[39]  An Gie Yong,et al.  A Beginner's Guide to Factor Analysis: Focusing on Exploratory Factor Analysis , 2013 .

[40]  David N. Ford,et al.  A real options approach to valuing strategic flexibility in uncertain construction projects , 2002 .

[41]  Samuel Famiyeh,et al.  Major causes of construction time and cost overruns , 2017 .

[42]  Albert P.C. Chan,et al.  Measuring complexity for building projects: a Delphi study , 2012 .

[43]  Sven Bertelsen,et al.  Construction as a Complex System , 2003 .