Competence Based Worker Assignment and Impacts on Production Scheduling in Precast Construction
暂无分享,去创建一个
Zhaojing Wang | Jie Gong | Hao Hu | Hao Hu | J. Gong | Zhaojing Wang
[1] Scott D. Brown,et al. The power law repealed: The case for an exponential law of practice , 2000, Psychonomic bulletin & review.
[2] Chao Mao,et al. A SWOT analysis for promoting off-site construction under the backdrop of China’s new urbanisation , 2018 .
[3] Hao Hu,et al. Improved Precast Production-Scheduling Model Considering the Whole Supply Chain , 2017, J. Comput. Civ. Eng..
[4] Antoni Świć,et al. Human Resource Selection for Manufacturing System Using Petri Nets , 2015 .
[5] Maghsud Solimanpur,et al. Designing a mathematical model for dynamic cellular manufacturing systems considering production planning and worker assignment , 2010, Comput. Math. Appl..
[6] Wilfried Sihn,et al. Planning assistance for pearl chain forecasts and personnel assignment planning of sequenced assembly lines , 2011 .
[7] Berend Denkena,et al. Competence-based process planning for the workshop production , 2013, Prod. Eng..
[8] Berend Denkena,et al. Simulation-based planning and evaluation of personnel scheduling in knowledge-intensive production systems , 2016, Prod. Eng..
[9] Bopaya Bidanda,et al. Worker assignment in cellular manufacturing considering technical and human skills , 2002 .
[10] Amir Karniel,et al. The exponential learning equation as a function of successful trials results in sigmoid performance , 2010 .
[11] Hao Hu,et al. RFID Enabled Knowledge-Based Precast Construction Supply Chain , 2017, Comput. Aided Civ. Infrastructure Eng..