Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit
暂无分享,去创建一个
[1] Roussos Dimitrakopoulos,et al. Stochastic optimization for strategic mine planning: A decade of developments , 2011 .
[2] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[3] E. Khorram,et al. Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade , 2014 .
[4] Matt Thompson,et al. Cut-off grade: A real options analysis , 2014 .
[5] M. Kumral,et al. A simulated annealing approach to mine production scheduling , 2005, J. Oper. Res. Soc..
[6] Peter A. Dowd. Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing , 2002 .
[7] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[8] Hasan Ghasemzadeh,et al. A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects , 2015 .
[9] P Huttagosol,et al. A computer design of ultimate pit limit by using transportation algorithm. , 1992 .
[10] M. Ataei,et al. Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits , 2004 .
[11] Mohammad Anemangely,et al. Optimal cut-off grade determination based on variable capacities in open-pit mining , 2012 .
[12] Paul V. Johnson,et al. The Determination of a Dynamic Cut-Off Grade for the Mining Industry , 2011 .
[13] R. Dimitrakopoulos,et al. Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis , 2009 .
[14] Afshin Akbari,et al. Effect of copper slag recovery on hydrometallurgical cut-off grades considering environmental aspects , 2016 .
[15] Akbar Esfahanipour,et al. An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection , 2013 .
[16] Mohammad Ataei,et al. Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .
[17] Salih Ramazan,et al. The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..
[18] Morteza Osanloo,et al. Determination of Open Pit Mining Cut-Off Grade Strategy Using Combination of Nonlinear Programming and Genetic Algorithm , 2011 .
[19] J. Gholamnejad,et al. Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging , 2015, Journal of Mining Science.
[20] Roussos Dimitrakopoulos,et al. A Heuristic Approach to Stochastic Cutoff Grade Optimization for Open Pit Mining Complexes , 2013 .
[21] Ambros M. Gleixner,et al. LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity , 2009, Comput. Oper. Res..
[22] Javad Sattarvand,et al. Long term production planning of open pit mines by ant colony optimization , 2015, Eur. J. Oper. Res..
[23] Takayoshi Shinkuma,et al. The choice of the cutoff grade in mining , 2003 .
[24] Kazem Oraee,et al. Determining the Optimum Cut-Off Grades in Sulfide Copper Deposits , 2015 .
[25] Bahram Rezai,et al. An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage , 2008 .
[26] Javad Gholamnejad. Determination of the Optimum Cutoff Grade Considering Environmental Cost , 2008 .
[27] Mehdi Keblouti,et al. The use of weather radar for rainfall-runoff modeling, case of Seybouse watershed (Algeria) , 2013, Arabian Journal of Geosciences.
[28] Kazem Oraee,et al. Considering environmental costs of copper production in cut-off grades optimization , 2014, Arabian Journal of Geosciences.
[29] Afshin Akbari,et al. Application of KKT in determining the final destination of mined material in multi-processing mines , 2016 .
[30] Mohammad Ataei,et al. Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits , 2003 .
[31] Thys B. Johnson,et al. Optimum multi period open pit mine production scheduling , 2016 .
[32] R. Dimitrakopoulos,et al. Incorporating geological and market uncertainties and operational flexibility into open pit mine design , 2011 .
[33] Roussos G. Dimitrakopoulos,et al. Global optimization of open pit mining complexes with uncertainty , 2016, Appl. Soft Comput..
[34] L. M. Giannini. Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.
[35] Asif Khan,et al. Production Scheduling of Open Pit Mines Using Particle Swarm Optimization Algorithm , 2014, Adv. Oper. Res..
[36] T. Chou,et al. Effective thermoelastic constants of short-fiber composites , 1981 .
[37] Kazuhiro Kawahata. New algorithm to solve large scale mine production scheduling problems by using the Lagrangian relaxation method, A , 2016 .
[38] Tsuyoshi Adachi,et al. Surface Mining Technologies, Today and Future. Optimum Production Scale and Scheduling of Open Pit Mines Using Revised 4-D Network Relaxation Method. , 2001 .
[39] Takashi Nishiyama,et al. The grade selection rule of the metal mines; an empirical study on copper mines , 2000 .
[40] Ahmad Asadi,et al. Determination of optimised cut-off grade utilising non-linear programming , 2015, Arabian Journal of Geosciences.
[41] Thys B Johnson,et al. OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .
[42] F Rashidinezhad,et al. Cutoff grades optimization with environmental management A case study: Sungun Copper Project , 2008 .