Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit

An integral connection exists among the mine production planning, the mined material destination, and the ultimate pit limit (UPL) in the mining engineering economy. This relation is reinforced by real information and the benefits it engenders in the mining economy. Hence, it is important to create optimizing algorithms to reduce the errors of economic calculations. In this work, a logical mathematical algorithm that considers the important designing parameters and the mining economy is proposed. This algorithm creates an optimizing repetitive process among different designing constituents and directs them into the maximum amount of the mine economical parameters. This process will produce the highest amount of ores and the highest degree of safety. The modeling produces a new relation between the concept of the cutoff grade, mine designing, and mine planning, and it provides the maximum benefit by calculating the destination of the ores. The proposed algorithm is evaluated in a real case study. The results show that the net present value of the mine production is increased by 3% compared to previous methods of production design and UPL.摘要在采矿工程经济中,矿山生产计划、开采材料目的地和最终开采极限(UPL)之间存在着整体 的联系,而实际信息及其在采矿经济中产生的效应会加强这种联系,因此,建立优化算法来减少经济 计算的误差是非常重要的。本文提出一种考虑重要设计参数和经济性的逻辑数学算法,该算法在不同 的设计成分之间建立了一个优化的重复过程,并使其将矿山经济参数最大化,产生最大的矿石量和最 高的安全度。该模型在截止品位、矿井设计和矿山规划之间建立了新的关系,并通过计算目标提供了 最大的效益。结果表明:与以往的生产设计和生产方法相比,矿山生产的净现值提高了3%。

[1]  Roussos Dimitrakopoulos,et al.  Stochastic optimization for strategic mine planning: A decade of developments , 2011 .

[2]  Alexandra M. Newman,et al.  A Review of Operations Research in Mine Planning , 2010, Interfaces.

[3]  E. Khorram,et al.  Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade , 2014 .

[4]  Matt Thompson,et al.  Cut-off grade: A real options analysis , 2014 .

[5]  M. Kumral,et al.  A simulated annealing approach to mine production scheduling , 2005, J. Oper. Res. Soc..

[6]  Peter A. Dowd Short-term mine production scheduling for industrial minerals using multi-objective simulated annealing , 2002 .

[7]  Amina Lamghari,et al.  A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..

[8]  Hasan Ghasemzadeh,et al.  A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects , 2015 .

[9]  P Huttagosol,et al.  A computer design of ultimate pit limit by using transportation algorithm. , 1992 .

[10]  M. Ataei,et al.  Using a Combination of Genetic Algorithm and the Grid Search Method to Determine Optimum Cutoff Grades of Multiple Metal Deposits , 2004 .

[11]  Mohammad Anemangely,et al.  Optimal cut-off grade determination based on variable capacities in open-pit mining , 2012 .

[12]  Paul V. Johnson,et al.  The Determination of a Dynamic Cut-Off Grade for the Mining Industry , 2011 .

[13]  R. Dimitrakopoulos,et al.  Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis , 2009 .

[14]  Afshin Akbari,et al.  Effect of copper slag recovery on hydrometallurgical cut-off grades considering environmental aspects , 2016 .

[15]  Akbar Esfahanipour,et al.  An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection , 2013 .

[16]  Mohammad Ataei,et al.  Determination of optimum cutoff grades of multiple metal deposits by using the Golden Section search method , 2003 .

[17]  Salih Ramazan,et al.  The new Fundamental Tree Algorithm for production scheduling of open pit mines , 2007, Eur. J. Oper. Res..

[18]  Morteza Osanloo,et al.  Determination of Open Pit Mining Cut-Off Grade Strategy Using Combination of Nonlinear Programming and Genetic Algorithm , 2011 .

[19]  J. Gholamnejad,et al.  Long-term production scheduling modeling for the open pit mines considering tonnage uncertainty via indicator kriging , 2015, Journal of Mining Science.

[20]  Roussos Dimitrakopoulos,et al.  A Heuristic Approach to Stochastic Cutoff Grade Optimization for Open Pit Mining Complexes , 2013 .

[21]  Ambros M. Gleixner,et al.  LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity , 2009, Comput. Oper. Res..

[22]  Javad Sattarvand,et al.  Long term production planning of open pit mines by ant colony optimization , 2015, Eur. J. Oper. Res..

[23]  Takayoshi Shinkuma,et al.  The choice of the cutoff grade in mining , 2003 .

[24]  Kazem Oraee,et al.  Determining the Optimum Cut-Off Grades in Sulfide Copper Deposits , 2015 .

[25]  Bahram Rezai,et al.  An environmental oriented model for optimum cut-off grades in open pit mining projects to minimize acid mine drainage , 2008 .

[26]  Javad Gholamnejad Determination of the Optimum Cutoff Grade Considering Environmental Cost , 2008 .

[27]  Mehdi Keblouti,et al.  The use of weather radar for rainfall-runoff modeling, case of Seybouse watershed (Algeria) , 2013, Arabian Journal of Geosciences.

[28]  Kazem Oraee,et al.  Considering environmental costs of copper production in cut-off grades optimization , 2014, Arabian Journal of Geosciences.

[29]  Afshin Akbari,et al.  Application of KKT in determining the final destination of mined material in multi-processing mines , 2016 .

[30]  Mohammad Ataei,et al.  Methods for Calculation of Optimal Cutoff Grades in Complex Ore Deposits , 2003 .

[31]  Thys B. Johnson,et al.  Optimum multi period open pit mine production scheduling , 2016 .

[32]  R. Dimitrakopoulos,et al.  Incorporating geological and market uncertainties and operational flexibility into open pit mine design , 2011 .

[33]  Roussos G. Dimitrakopoulos,et al.  Global optimization of open pit mining complexes with uncertainty , 2016, Appl. Soft Comput..

[34]  L. M. Giannini Optimum design of open pit mines , 1991, Bulletin of the Australian Mathematical Society.

[35]  Asif Khan,et al.  Production Scheduling of Open Pit Mines Using Particle Swarm Optimization Algorithm , 2014, Adv. Oper. Res..

[36]  T. Chou,et al.  Effective thermoelastic constants of short-fiber composites , 1981 .

[37]  Kazuhiro Kawahata New algorithm to solve large scale mine production scheduling problems by using the Lagrangian relaxation method, A , 2016 .

[38]  Tsuyoshi Adachi,et al.  Surface Mining Technologies, Today and Future. Optimum Production Scale and Scheduling of Open Pit Mines Using Revised 4-D Network Relaxation Method. , 2001 .

[39]  Takashi Nishiyama,et al.  The grade selection rule of the metal mines; an empirical study on copper mines , 2000 .

[40]  Ahmad Asadi,et al.  Determination of optimised cut-off grade utilising non-linear programming , 2015, Arabian Journal of Geosciences.

[41]  Thys B Johnson,et al.  OPTIMUM OPEN PIT MINE PRODUCTION SCHEDULING , 1968 .

[42]  F Rashidinezhad,et al.  Cutoff grades optimization with environmental management A case study: Sungun Copper Project , 2008 .