“Smart Factory”: Intelligent System for Workshop Resource Allocation, Scheduling, Optimization and Controlling in Real Time
暂无分享,去创建一个
Petr Skobelev | Alexander Tsarev | Sergey Kozhevnikov | Yaroslav Shepilov | Elena V. Simonova | Oleg Kuznetsov | Alexey Goryachev | Elina Kolbova | P. Skobelev | A. Goryachev | A. Tsarev | E. Simonova | S. Kozhevnikov | Elina Kolbova | Oleg Kuznetsov | Yaroslav Shepilov
[1] Petr Skobelev,et al. Multi-agent system “Smart Factory” for real-time workshop management: Results of design & implementation for Izhevsk Axion-Holding Factory , 2012, Proceedings of 2012 IEEE 17th International Conference on Emerging Technologies & Factory Automation (ETFA 2012).
[2] Iyad Abu Doush,et al. Multi-Agent Systems - Modeling, Control, Programming, Simulations and Applications , 2011 .
[3] Petr Skobelev,et al. Bio-Inspired Multi-Agent Technology for Industrial Applications , 2011 .
[4] Joseph Y.-T. Leung,et al. Handbook of Scheduling: Algorithms, Models, and Performance Analysis , 2004 .
[5] Petr Skobelev,et al. Multi-Agent Systems for Real Time Resource Allocation, Scheduling, Optimization and Controlling: Industrial Applications , 2011, HoloMAS.
[6] Jacques Carlier,et al. Handbook of Scheduling - Algorithms, Models, and Performance Analysis , 2004 .
[7] Stefan Voß,et al. Meta-heuristics: The State of the Art , 2000, Local Search for Planning and Scheduling.