Construction Portfolio Performance Management Using Key Performance Indicators

The purpose of this study is to determine the relative importance of key results areas (KRAs) and develop key performance indicators (KPIs) for construction portfolio performance management. The research methodology consists of the following steps: (1) Designing and conducting a factfinding survey of owners and contractors to determine the relative importance of KRAs; (2) Designing and conducting structured interviews to develop KPIs; and (3) Assessing the usefulness of the results. Unlike the literature that has consistently highlighted the importance of risk management for construction portfolio performance management, risk management is not among top five KRAs (schedule, cost, cash flow, change management and safety) identified in the survey. This represents the significant gap in how research community and industry look at portfolio performance management. When it comes to dashboard development, contractors and owners have different KRAs within their dashboard for portfolio management. The limited knowledge about the relative importance of KRAs is one of the most important barriers towards managing project portfolios. This study is the first attempt to critically examine the literature and practice of construction portfolio performance management in order to highlight noteworthy differences between KRAs studied by the research community and implemented by the industry.

[1]  Zayyana Shehu,et al.  Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis , 2010 .

[2]  Zayyana Shehu,et al.  Construction programme management theory and practice: Contextual and pragmatic approach , 2009 .

[3]  Sangyoon Chin,et al.  Comparable Performance Measurement System for Construction Companies , 2007 .

[4]  Tomas Blomquist,et al.  Middle Managers in Program and Project Portfolio Management : Practices, Roles and Responsibilities , 2006 .

[5]  Ashraf Elazouni Heuristic method for multi‐project finance‐based scheduling , 2009 .

[6]  Ali Touran,et al.  A Framework to Form Balanced Project Portfolios , 2016 .

[7]  Amr Kandil,et al.  Construction Risks: Single versus Portfolio Insurance , 2010 .

[8]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[9]  Po-Han Chen,et al.  Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints , 2009 .

[10]  Po-Han Chen,et al.  Simulated Annealing Algorithm for Optimizing Multi-Project Linear Scheduling with Multiple Resource Constraints , 2007 .

[11]  Po-Han Chen,et al.  Stochastic Scheduling with Multiple Resource Constraints Using a Simulated Annealing-Based Algorithm , 2008 .

[12]  Bon-Gang Hwang,et al.  Performance Dashboard for a Pharmaceutical Project Benchmarking Program , 2012 .

[13]  Wayne W. Eckerson Performance Dashboards: Measuring, Monitoring, and Managing Your Business , 2005 .

[14]  Baabak Ashuri,et al.  Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning , 2015 .

[15]  Mohammad Ali Abido,et al.  Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio , 2011 .

[16]  Ali Touran Probabilistic Approach for Budgeting in Portfolio of Projects , 2010 .

[17]  Baabak Ashuri,et al.  Stochastic Optimization of Construction Projects Planning with Genetic Algorithm , 2012 .

[18]  Duncan David Nulty,et al.  The adequacy of response rates to online and paper surveys: what can be done? , 2008 .

[20]  Mohan M. Kumaraswamy,et al.  Systematizing Construction Project Evaluations , 1996 .

[22]  David Veshosky,et al.  Portfolio Approach to Strategic Management of A/E Firms , 1994 .

[23]  Baabak Ashuri,et al.  Development of Fuzzy Enabled Shuffled Frog Leaping Algorithm with Activity Splitting Allowed in Construction Project Scheduling , 2012 .

[24]  Simaan M. AbouRizk,et al.  Managing Performance in Construction , 2010 .

[25]  Liang Y. Liu,et al.  Cost Information Model for Managing Multiple Projects , 2007 .

[26]  Po-Han Chen,et al.  MODIFIED SIMULATED ANNEALING ALGORITHM AND MODIFIED TWO-STAGE SOLUTION FINDING PROCEDURE FOR OPTIMIZING LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS , 2007 .

[27]  Tarek Zayed,et al.  FINANCE-BASED SCHEDULING FOR MULTIPLE PROJECTS WITH MULTIMODE ACTIVITIES , 2012 .

[28]  Makarand Hastak,et al.  Construction Research Congress 2012 : Construction Challenges in a Flat World , 2012 .

[29]  Zayyana Shehu,et al.  Construction programme management skills and competencies: a deeper insight , 2011 .

[30]  Ammar Peter Kaka,et al.  Development of a company‐level dynamic cash flow forecasting model (DYCAFF) , 2003 .

[31]  Kenneth F. Reinschmidt,et al.  Probabilistic Forecasting of Project Duration Using Bayesian Inference and the Beta Distribution , 2009 .

[32]  Dulcy M. Abraham,et al.  Portfolio Cash Assessment Using Fuzzy Systems Theory , 2011 .

[33]  Luis F. Alarcón,et al.  Benchmarking System for Evaluating Management Practices in the Construction Industry , 2004 .

[34]  David S. Wilson,et al.  Assessing the performance of construction projects: Implementing earned value management at the General Services Administration , 2005 .

[35]  Baabak Ashuri,et al.  Applying the shuffled frog-leaping algorithm to improve scheduling of construction projects with activity splitting allowed , 2011 .

[36]  Min-Yuan Cheng,et al.  Construction management process reengineering: Organizational human resource planning for multiple projects , 2006 .

[37]  Wayne W. Eckerson What Are Performance Dashboards , 2012 .