Achieving Optimal Cycle Time Improvement in a 300mm Semiconductor Fab Using Dynamic Simulation
暂无分享,去创建一个
[1] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[2] P. R. Kumar,et al. Re-entrant lines , 1993, Queueing Syst. Theory Appl..
[3] J. Martins,et al. Front-end, single-wafer diffusion processing for advanced 300-mm fabrication lines , 2001 .
[4] Appa Iyer Sivakumar,et al. Simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication , 2002, Proceedings of the Winter Simulation Conference.
[5] Edward A. MacNair,et al. 300 mm wafer fabrication line simulation model , 2002, Proceedings of the Winter Simulation Conference.
[6] James R. Wilson,et al. Experimental performance evaluation of batch means procedures for simulation output analysis , 2000, 2000 Winter Simulation Conference Proceedings (Cat. No.00CH37165).
[7] Michael O’Brien. IMPROVING MANUFACTURING SIMULATIONS BY MODELING TECHNICIAN DECISION PROCESSES , 1999 .