Beyond downsizing: recreating in Australia
暂无分享,去创建一个
[1] T. Hout,et al. Competing Against Time , 1990 .
[2] Wayne F. Cascio,et al. Downsizing: What do we know? What have we learned? , 1993 .
[3] Amrik S. Sohal,et al. Management, myopia and strategy in the manufacturing function: a problem driven research agenda , 1993 .
[4] E. A. Hall,et al. How to Make Reengineering Really Work , 1994 .
[5] M. Hammer,et al. Reengineering the Corporation , 1993 .
[6] S. Drew. Downsizing to Improve Strategic Position , 1994 .
[7] P. Veasey. Managing a programme of business re-engineering projects in a diversified business , 1994 .
[8] Tok Wang Ling,et al. Model-based support for business re-engineering , 1996, Inf. Softw. Technol..
[9] Stuart Orr,et al. A longitudinal survey of robot usage in Australia , 1996 .
[10] Johnny Chu,et al. Hydro-Electric Corporation's PMLink: A case study of re-engineering through workflow computing , 1997, Bus. Process. Manag. J..
[11] David J. Collis,et al. Corporate Strategy: A Resource-Based Approach , 1997 .
[12] L. Bennington,et al. The road to privatization: TQM and business planning , 1997 .
[13] T. V. D. Wiele,et al. Insights into TQM and downsizing in large organizations , 1997 .
[14] Amrik S. Sohal. A longitudinal study of planning and implementation of advanced manufacturing technologies , 1997 .
[15] R. Sadler. The Australian experience: managing a non‐metropolitan urban water utility ‐ paradigm shifting towards a new mindset , 1998 .
[16] P. Murray,et al. Continuous improvement in hospitality: a case study approach , 1998 .