Minimizing energy consumption in a straight robotic assembly line using differential evolution algorithm
暂无分享,去创建一个
Zixiang Li | Peter Nielsen | Mukund Nilakantan Janardhanan | S. G. Ponnambalam | S. Ponnambalam | Zixiang Li | M. Janardhanan | Peter Nielsen
[1] Rainer Storn,et al. Differential Evolution – A Simple and Efficient Heuristic for global Optimization over Continuous Spaces , 1997, J. Glob. Optim..
[2] S. G. Ponnambalam,et al. Differential evolution algorithm for solving RALB problem using cost- and time-based models , 2017 .
[3] Pawel Pawlewski,et al. A Multi-agent System for Selecting Portfolio of New Product Development Projects , 2015, PAAMS.
[4] A. Gandomi,et al. A novel improved accelerated particle swarm optimization algorithm for global numerical optimization , 2014 .
[5] S. G. Ponnambalam,et al. Scheduling Flexible Assembly Lines Using Differential Evolution , 2011, SEMCCO.
[6] Gregory Levitin,et al. A genetic algorithm for robotic assembly line balancing , 2006, Eur. J. Oper. Res..
[7] Mehmet Bayram Yildirim,et al. A framework to minimise total energy consumption and total tardiness on a single machine , 2008 .
[8] S. G. Ponnambalam,et al. An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems , 2015 .
[9] Lawrence Davis,et al. Applying Adaptive Algorithms to Epistatic Domains , 1985, IJCAI.
[10] S. G. Ponnambalam,et al. Application of Particle Swarm Optimization to Maximize Efficiency of Straight and U-Shaped Robotic Assembly Lines , 2016, DCAI.
[11] Sanja Petrovic,et al. An investigation into minimising total energy consumption and total weighted tardiness in job shops , 2014 .