Efficient methods for the allocation of resources in project networks
暂无分享,去创建一个
[1] William Prager. A Structural Method of Computing Project Cost Polygons , 1963 .
[2] A. A. McGee,et al. Optimum Allocation of Research/Engineering Manpower within a Multi-Project Organizational Structure , 1962 .
[3] D. R. Fulkerson. A Network Flow Computation for Project Cost Curves , 1961 .
[4] William S. Jewell,et al. Decomposition of Project Networks , 1965 .
[5] E. B. Berman,et al. Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions , 1964 .
[6] Jack Moshman,et al. RAMPS: a technique for resource allocation and multi-project scheduling , 1899, AFIPS Spring Joint Computing Conference.
[7] Joseph J. Moder,et al. Project Management with CPM and PERT , 1964 .
[8] W. L. Meyer,et al. Extensions of the critical path method through the application of integer programming , 1963 .
[9] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[10] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[11] S. Lambourn,et al. Resource allocation and multi-project scheduling (RAMPS) - a new tool in planning and control , 1963, Computer/law journal.
[12] W. Jewell. Risk-Taking in Critical Path Analysis , 1965 .
[13] F K Levy,et al. Multiship, multishop, workload‐smoothing progfum , 1962 .