Quantitative evaluation of the organisation of manufacturing and technological processes
暂无分享,去创建一个
[1] Zdzisław Hejducki. SCHEDULING MODEL OF CONSTRUCTION ACTIVITY WITH TIME COUPLINGS , 2003 .
[2] Jurgita Antucheviciene,et al. Evaluation of Ranking Accuracy in Multi-Criteria Decisions , 2006, Informatica.
[3] Anna Sobotka,et al. Scheduling construction projects with resources accessibility limited and changeable in time , 2004 .
[4] Oleg Kapliński,et al. Three phases of multifactor modelling of construction processes , 2006 .
[5] Leonas Ustinovichius,et al. Development of Software for Multiple Criteria Evaluation , 2003, Informatica.
[6] Edmundas Kazimieras Zavadskas,et al. LEVI 3.0—MULTIPLE CRITERIA EVALUATION PROGRAM FOR CONSTRUCTION SOLUTIONS , 2002 .
[7] Photios G. Ioannou,et al. Scheduling projects with repeating activities , 1998 .
[8] James E. Rowings,et al. Linear Scheduling Model: Development of Controlling Activity Path , 1998 .
[9] Romualdas Tamosaitis. Simulation of Technological Processes of Civil Engineering Companies , 2001, Informatica.
[10] Richard E. Klosterman,et al. AHP: Multiple Criteria Evaluation , 1998 .
[11] Edmundas Kazimieras Zavadskas,et al. AN OVERVIEW OF THE PROBLEMS RELATED TO RESEARCH IN CONSTRUCTION ENGINEERING, MANAGEMENT AND ECONOMICS IN POLAND , 2002 .
[12] Romualdas Tamošaitis. GRAPHO-ANALYTICAL METHOD FOR DETERMINING POSSIBILITIES OF USING DISCRETE MULTIUSE (DMU) RESOURCES IN CIVIL ENGINEERING COMPANIES , 2002 .