Factors affecting the uptake of building information modelling (BIM) in the Auckland architecture, engineering & construction (AEC) industry
暂无分享,去创建一个
[1] Martin Fischer,et al. Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..
[2] Andrew R.J. Dainty,et al. The extent of team integration within construction projects , 2006 .
[3] Dana K. Smith,et al. Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers , 2009 .
[4] Laura Johnson,et al. How Many Interviews Are Enough? , 2006 .
[5] Rafael Sacks,et al. Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .
[6] Suzanne Wilkinson,et al. RECONSTRUCTION PROCUREMENT SYSTEMS: THE 2005 MATATA FLOOD RECONSTRUCTION EXPERIENCE , 2005 .
[7] Robert Amor,et al. Sharing Building Information using the IFC Data Model for FDS Fire Simulation , 2008 .
[8] Robert J. Krawczyk,et al. Two Approaches to BIM: A Comparative Study , 2004 .
[9] Patrick C. Suermann. Evaluating The Impact Of Building Information Modeling (BIM) On Construction , 2009 .
[10] Rafael Sacks,et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms , 2008, J. Inf. Technol. Constr..
[11] D. Turner. Qualitative Interview Design: A Practical Guide for Novice Investigators , 2010 .
[12] Nashwan Dawood,et al. Measuring the effectiveness of 4D planning as a valuable communication tool , 2008, J. Inf. Technol. Constr..