Factors affecting the uptake of building information modelling (BIM) in the Auckland architecture, engineering & construction (AEC) industry

[1]  Martin Fischer,et al.  Benefits and lessons learned of implementing building virtual design and construction (VDC) technologies for coordination of mechanical, electrical, and plumbing (MEP) systems on a large healthcare project , 2008, J. Inf. Technol. Constr..

[2]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[3]  Dana K. Smith,et al.  Building Information Modeling: A Strategic Implementation Guide for Architects, Engineers, Constructors, and Real Estate Asset Managers , 2009 .

[4]  Laura Johnson,et al.  How Many Interviews Are Enough? , 2006 .

[5]  Rafael Sacks,et al.  Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice , 2008 .

[6]  Suzanne Wilkinson,et al.  RECONSTRUCTION PROCUREMENT SYSTEMS: THE 2005 MATATA FLOOD RECONSTRUCTION EXPERIENCE , 2005 .

[7]  Robert Amor,et al.  Sharing Building Information using the IFC Data Model for FDS Fire Simulation , 2008 .

[8]  Robert J. Krawczyk,et al.  Two Approaches to BIM: A Comparative Study , 2004 .

[9]  Patrick C. Suermann Evaluating The Impact Of Building Information Modeling (BIM) On Construction , 2009 .

[10]  Rafael Sacks,et al.  Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms , 2008, J. Inf. Technol. Constr..

[11]  D. Turner Qualitative Interview Design: A Practical Guide for Novice Investigators , 2010 .

[12]  Nashwan Dawood,et al.  Measuring the effectiveness of 4D planning as a valuable communication tool , 2008, J. Inf. Technol. Constr..