A Direct Calculation of Shift Factors Under Network Islanding

The outage of transmission lines, especially of multiple lines, could cause power network islanding. Traditional line outage distribution factors cannot be directly used for the power flow calculation under network islanding. This letter proposes a direct and fast two-phase method for calculating shift factors under network islanding by leveraging existing shift factors of base case (pre-contingency) network.