Development Requirements for an Advanced Gas Turbine System
暂无分享,去创建一个
In cooperation with US Department of Energy`s Morgantown Energy Technology Center, a Westinghouse-led team is working on the second part of an 8-year, Advanced Turbine Systems Program to develop the technology required to provide a significant increase in natural gas-fired combined cycle power generation plant efficiency. This paper reports on the Westinghouse program to develop an innovative natural gas-fired advanced turbine cycle, which, in combination with increased firing temperature, use of advanced materials, increased component efficiencies, and reduced cooling air usage, has the potential of achieving a lower heating value plant efficiency in excess of 60%.
[1] Michael L. Parker,et al. Overview of the WR-21 Intercooled Recuperated Gas Turbine Engine System: A Modern Engine for a Modern Fleet , 1993 .
[2] R. L. Bannister,et al. Hot gas cleaning makes promising progress , 1993 .
[3] R. A. Bajura,et al. Advanced Turbine Systems Program and coal applications , 1993 .