Risk identification and allocation in underground rail construction joint ventures: contractors’ perspective

AbstractInternational construction joint ventures (ICJVs) have been widely used in large-scale infrastructure projects all over the world. This study aims to investigate the factors affecting adoption of ICJVs for underground rail construction projects, to identify the critical risks faced by parties that perform the projects under ICJVs, and to examine the obstacles to appropriate risk allocation among the parties under ICJVs. To achieve these objectives, an in-depth literature review was carried out and a questionnaire survey was conducted with 33 contractor firms as well. The survey results reported “sharing of project risks” as the top attractive factor of ICJVs and “differences in culture and working style” as the top negative factor. In addition, both foreign and local contractors considered “partners disagree over some conditions in contract” the most critical risk to the parties involving projects under ICJVs. While risk allocation was perceived to be very important for ICJVs, “unclear division of...

[1]  He Zhi,et al.  Risk management for overseas construction projects , 1995 .

[2]  Mohammad Javad Vahdatirad,et al.  Choosing TBM for Tabriz subway using multi criteria method , 2010 .

[3]  Dan Wang,et al.  Modelling risk allocation decision in construction contracts , 2007 .

[4]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[5]  M. Dulaimi,et al.  Risk management framework for construction projects in developing countries , 2004 .

[6]  Govindan Sridharan,et al.  Determinants of joint venture performance in the construction industry: cases from the mass rapid transit project of Singapore , 1995 .

[7]  Hiroshi Shimizu Japanese Firms in Contemporary Singapore , 2008 .

[8]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[9]  Luca Burlò Joint ventures in the construction industry , 2016 .

[10]  Håkan Stille,et al.  Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation , 2005 .

[11]  Bon-Gang Hwang,et al.  Measuring the Impact of Rework on Construction Cost Performance , 2009 .

[12]  Martin Skitmore,et al.  Risk Management in Singapore Construction Joint Ventures , 2000 .

[13]  G. Wu,et al.  Risk Assessment for Construction Joint Ventures in China , 2001 .

[14]  Robert Frank Cushman,et al.  Construction Contractor's Handbook of Business and Law , 1992 .

[15]  S. Ogunlana,et al.  Good project governance for proper risk allocation in public–private partnerships in Indonesia , 2006 .

[16]  Albert P.C. Chan,et al.  Developing a Fuzzy Risk Allocation Model for PPP Projects in China , 2010 .

[17]  Bon-Gang Hwang,et al.  Identifying the critical factors affecting schedule performance of public housing projects , 2013 .

[18]  Li Bing,et al.  Risk management in international construction joint ventures , 1999 .

[19]  R Ruben Favié,et al.  Risk Allocation in Joint Ventures , 2009 .

[20]  Choon Meng. Yeo Risk management in construction joint ventures. , 1995 .

[21]  B. Hwang,et al.  Public private partnership projects in Singapore factors, critical risks and preferred risk allocation from the perspective of contractors / , 2013 .

[22]  Zhao Xian-bo Application of Evaluation Strategy in the Tendering and Bidding Game of Nanjing Metro Projects , 2010 .

[23]  Jun g Sik Kong,et al.  Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM , 2009 .

[24]  George Ofori,et al.  Factors influencing development of construction enterprises in Singapore , 2001 .

[25]  Herbert H. Einstein,et al.  Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study , 2011 .

[26]  Hamimah Adnan An Assessment of Risk Management in Joint Venture Projects (JV) in Malaysia , 2009 .

[27]  B. Akinci,et al.  FACTORS AFFECTING CONTRACTORS' RISK OF COST OVERBURDEN , 1998 .

[28]  Patrick X.W. Zou,et al.  Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China , 2007 .

[29]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .

[30]  Louis Ngai Yuen Wong,et al.  Environmental risk management for a cross interchange subway station construction in China , 2011 .

[31]  R. Lyman Ott.,et al.  An introduction to statistical methods and data analysis , 1977 .

[32]  Li Bing,et al.  Risk management model for international construction joint ventures , 1999 .