A New Look at Predicting Gas-Well Load-Up

This paper discusses results of field tests conducted to verify minimum flow rate (critical rate) required to keep low-pressure gas wells unloaded and compares results to previous work. This paper also covers liquid yield effects, liquid sources, verification that wellhead conditions control onset of load-up, and effects of temperature, gas/liquid gravities, wellbore diameter, and packer/tubing setting depth.