Open Building Manufacturing: Core Concepts and Industrial Requirements
暂无分享,去创建一个
Matti Hannus | Abdul Samad Kazi | S. Boudjabeur | A. W. Malone | A. Kazi | M. Hannus | S. Boudjabeur
[1] L. C. Koo. Learning Action Learning , 1999 .
[2] Ronald D. Snee,et al. What's Missing in Statistical Education? , 1993 .
[3] Kenzo Kurihara,et al. Efficient Monte Carlo simulation method of GERT-type network for project management , 2002 .
[4] Carol Ascher,et al. Cooperative Education as a Strategy for School-to-Work Transition. , 1994 .
[5] Dirk Seifert,et al. Mutual customer approach: how industry and trade are executing collaborative customer relationship management , 2001 .
[6] Doo Hun Lim,et al. Trainee Perceptions of Factors that Influence Learning Transfer , 2002 .
[7] Christoph H. Loch,et al. Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..
[8] Richard E. Hicks. Experiential learning in a postgraduate project management programme , 1996 .
[9] Stephen A. Stumpf,et al. Microworlds and Simuworlds: Practice Fields for the Learning Organization , 1996 .
[10] John S. Lamancusa,et al. The Learning Factory—A New Approach to Integrating Design and Manufacturing into the Engineering Curriculum , 1997 .
[11] Geoff Hayton,et al. What drives enterprise training? Evidence from Australia , 1999 .
[12] D. Kolb. Experiential Learning: Experience as the Source of Learning and Development , 1983 .
[13] Ting-Ya Hsieh,et al. The economic implications of subcontracting practice on building prefabrication , 1997 .
[14] Raymond Y. C. Tse,et al. An empirical analysis of the barriers to implementing e‐commerce in small‐medium sized construction contractors in the state of Victoria, Australia , 2001 .
[15] Andrew N. Baldwin,et al. A Data Flow Model to Plan and Manage the Building Design Process , 1996 .
[16] Alison Alker,et al. Managing learning: what do we learn from a learning organisation? , 1998 .
[17] F. Caeldries. Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .
[18] Robert G. Cooper,et al. Stage-gate systems: A new tool for managing new products , 1990 .
[19] M. Porter. Competitive Advantage: Creating and Sustaining Superior Performance , 1985 .
[20] Robert K. Tener,et al. Industry-University Partnerships for Construction Engineering Education , 1996 .
[21] Vivian W. Y Tam,et al. Implementation of environmental management in the Hong Kong construction industry , 2002 .
[22] Lloyd Davies,et al. Why kick the “L” out of “LEarning”? The development of students’ employability skills through part‐time working , 2000 .
[23] David Gee,et al. Analysing Clusters of Skills in R&D — Core Competencies, Metaphors, Visualization, and the Role of it , 1998 .
[24] Graham Winch,et al. How innovative is construction? Comparing aggregated data on construction innovation and other sectors – a case of apples and pears , 2003 .
[25] Curba Morris Lampert,et al. Entrepreneurship in the large corporation: a longitudinal study of how established firms create breakthrough inventions , 2001 .
[26] Peter W. G. Morris,et al. The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .
[27] E. Murphy,et al. Technology‐enhanced learning: An Irish industry perspective , 2005 .
[28] Christoph H. Loch,et al. Communication and Uncertainty in Concurrent Engineering , 1998 .
[29] Bridget N. O'Connor. The workplace learning cycle: A problem‐based curriculum model for the preparation of workplace learning professionals , 2004 .
[30] M Jamieson,et al. Refocusing collaboration technologies in the construction value chain , 1996 .
[31] Carlos Balaguer,et al. Open Issues and Future Possibilities in the EU Construction Automation , 2000 .
[32] Timothy T. Baldwin,et al. TRANSFER OF TRAINING: A REVIEW AND DIRECTIONS FOR FUTURE RESEARCH , 1988 .
[33] George Papagiannakis,et al. Immersive VR decision training: telling interactive stories featuring advanced virtual human simulation technologies , 2003 .
[34] Adrian. Sargeant. Training for growth: how can education providers assist in the development of small businesses? , 1996 .
[35] M. Knowles. The Modern Practice of Adult Education: From Pedagogy to Andragogy , 1970 .
[36] Raymond Y. C. Tse. THE IMPLEMENTATION OF EMS IN CONSTRUCTION FIRMS: CASE STUDY IN HONG KONG , 2001 .
[37] Gopal K. Kanji,et al. Quality culture in the construction industry , 1998 .
[38] Vivian W. Y Tam,et al. Use of Prefabrication to Minimize Construction Waste - A Case Study Approach , 2005 .
[39] Peter E.D. Love,et al. Construction managers’ expectations and observations of graduates , 2001 .
[40] A. Strauss. Basics Of Qualitative Research , 1992 .
[41] Iris D. Tommelein,et al. Upstream Problem Solving Under Uncertainty and Ambiguity: Evidence From Airport Expansion Projects , 2008, IEEE Transactions on Engineering Management.
[42] Yacine Rezgui,et al. Paving the Way to the Vision of Digital Construction: A Strategic Roadmap , 2006 .
[43] E. Blümel. Pragmatic Approach to Apply Virtual Reality Technology in Accelerating a Product Life Cycle , 2004 .
[44] Frank Biocca,et al. Virtual Reality Technology: A Tutorial , 1992 .
[45] A. Drejer. Frameworks for the magement of technology: towards a contingent approach , 1996 .
[46] G. Huber. Organizational Learning: The Contributing Processes and the Literatures , 1991 .
[47] Aaron J. Shenhar,et al. Toward a typological theory of project management , 1996 .
[48] K. Eisenhardt. Building theories from case study research , 1989, STUDI ORGANIZZATIVI.
[49] Don T. Phillips,et al. Fundamentals Of Network Analysis , 1981 .
[50] Christine Wall,et al. UK construction skills in the context of European developments , 1998 .
[51] P. John Clarkson,et al. Change and customisation in complex engineering domains , 2004 .
[52] Jian Zuo,et al. Project Culture within Construction Projects - A Pilot Case Study , 2006 .
[53] Sai On Cheung,et al. Site pre-cast yard layout arrangement through genetic algorithms , 2002 .
[54] Christoph H. Loch,et al. Measuring the Effectiveness of Overlapping Development Activities , 1999 .
[55] M. Kumaraswamy. Conflicts, claims and disputes in construction , 1997 .
[56] Mustafa Alshawi,et al. Generic and specific IT training: a process protocol model for construction , 2002 .
[57] Maged Dessouky,et al. A Virtual Factory Teaching System in Support of Manufacturing Education , 1998 .
[58] Durward K. Sobek,et al. Toyota's Principles of Set-Based Concurrent Engineering , 1999 .
[59] Chi S. Poon,et al. Management and Recycling of Demolition Waste in Hong Kong , 1997 .
[60] Karl T. Ulrich,et al. Product Design and Development , 1995 .
[61] Serghei Floricel,et al. Rising to the Challenge of Evolving High-Stakes Games , 2001 .
[62] Carlos Balaguer,et al. EU FutureHome Project Results , 2003 .
[63] R. Felder,et al. Learning and Teaching Styles in Engineering Education. , 1988 .
[64] A. Strauss,et al. The discovery of grounded theory: strategies for qualitative research aldine de gruyter , 1968 .
[65] Lee W. Schruben,et al. External Change in Large Engineering Design Projects: The Role of the Client , 2006, IEEE Transactions on Engineering Management.
[66] Natasa Rupcic,et al. The fifth discipline-the art and practice of the learning organisation , 2002 .
[67] Rod Coombs,et al. `Knowledge management practices' and path-dependency in innovation , 1998 .
[68] Mike Parsons,et al. Mastering the Dynamics of Innovation: How Companies Can Seize Opportunities in the Face of Technological Change. By James Utterback. Boston: Harvard Business School Press, 1996. 253 pp. ISBN: 0-875-84342-5 , 2007, Business History Review.
[69] Derek Clements-Croome. Creating the Productive Workplace , 1999 .
[70] F. Krogt,et al. Training in different types of organizations: differences and dynamics in the organization of learning at work , 1997 .
[71] Stephen Kendall,et al. Residential Open Building , 2000 .
[72] Mohan M. Kumaraswamy. Improving Industry Performance through Integrated Training Programs , 1997 .
[73] Paul Humphreys,et al. Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .
[74] Raja R. A. Issa,et al. Management’s Perception of Key Performance Indicators for Construction , 2003 .
[75] P. Senge. THE FIFTH DISCIPLINE , 1997 .
[76] Steven D. Eppinger,et al. A Model-Based Framework to Overlap Product Development Activities , 1997 .
[77] Jian Zuo,et al. Project Culture within Construction Projects: A Literature Review , 2005 .
[78] P. A. Tanner,et al. Monitoring environmental pollution in Hong Kong: trends and prospects , 1997 .
[79] Peter McHardy,et al. Closing the gap between what industry needs and what HE provides , 2000 .
[80] Matt O'Connell. TRAINING AS A POTENTIAL PROFIT CENTER , 1996 .
[81] Catherine M. Sleezer,et al. Training needs assessment at work: A dynamic process , 1993 .
[82] Michael Schrage,et al. Serious Play: How the World's Best Companies Simulate to Innovate , 1999 .
[83] Keith D. Hampson,et al. An example of developing a business model for information and communication technologies (ICT) adoption on construction projects – the National Museum of Australia project , 2003 .
[84] Steffen Bayer,et al. Business dynamics: Systems thinking and modeling for a complex world , 2004 .
[85] Jeffrey S. Rosenthal,et al. Active Learning Strategies in Advanced Mathematics Classes. , 1995 .
[86] Maria Roussou,et al. Learning by doing and learning through play: an exploration of interactivity in virtual environments for children , 2004, CIE.
[87] C. Prahalad,et al. The Core Competence of the Corporation , 1990 .
[88] Will Hughes,et al. Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings , 2004 .
[89] Rosemary Harrison,et al. External Consistency: The Key to Success in Management Development Programmes? , 1998 .
[90] Steven D. Eppinger,et al. Performance of Coupled Product Development Activities with a Deadline , 2001, Manag. Sci..
[91] Felicity Kelliher,et al. A learning framework for the small business environment , 2006 .
[92] Davar Rezania,et al. An evaluation system for training programs: a case study using a four‐phase approach , 2006 .
[93] C. M. Tam,et al. Cutting Construction Wastes by Prefabrication , 2006 .
[94] Jan Venselaar,et al. DESIGN RULES , 1999 .
[95] Margaret Honey,et al. A manual of learning styles , 1986 .
[96] Brian Wood. Approaching the care‐free building , 2003 .
[97] Derek H.T. Walker,et al. Procurement strategies : a relationship-based approach , 2003 .
[98] Yossi Sheffi,et al. The Resilient Enterprise: Overcoming Vulnerability for Competitive Advantage , 2005 .
[99] Christoph H. Loch,et al. Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..
[100] Evert Gummesson,et al. Broadening and Specifying Relationship Marketing , 1994 .
[101] George Ofori,et al. Enhancing integration and innovation in construction , 2002 .
[102] Sandra Vandermerwe,et al. The process of market-driven transformation , 1995 .
[103] David. Proverbs,et al. Construction time performance: an evaluation of contractors from Japan, the UK and the US , 2002 .
[104] Ron Anjard. Process mapping: a valuable tool for construction management and other professionals , 1998 .
[105] R. M. Eastman. Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.
[106] Audley Genus. Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel , 1997 .