Open Building Manufacturing: Core Concepts and Industrial Requirements

In order to be prepared for the future and to stay competitive there is an increasing need for construction to take appropriate actions to improve in many areas and also to keep pace with current technological achievements and innovations especially when compared to advancements in other industries. ManuBuild is targeted at providing a holistic approach to solve highly relevant problems construction is currently facing. The vision of ManuBuild is open building manufacturing, a new paradigm for building production and conceiving business by combining value driven, innovative, efficient and safe manufacturing and assembly in factories and on construction sites and an open system for products and components offering diversity of supply and building component configuration (on demand) opportunities in the open market. The core of the strategy of ManuBuild to cope with construction's challenges, to drastically improve customer orientation and thus for achieving the overall goal Open Building Manufacturing, is driven by the necessity to completely and consistently combine the concepts of "open systems" AND "efficient manufacturing". By having for the first time buildings designed for manufacture and customisation, using ambient manufacturing, the production of buildings will be taken far beyond today’s pre-fabrication concepts, which (up to now) are little more than "bringing construction indoors". The result will be much more customer oriented, customisable, open, scalable, cost-efficient and at higher quality. To this end the ManuBuild Open Building Manufacturing System is developed, which is an integrated system that holistically incorporates Building Concepts, Business Processes, Production Technologies and ICT Support as well as Training and thus enables future construction to act as a flexible, agile, value-driven and knowledge based industry and most of all to be highly customer-centric, efficient and competitive.

[1]  L. C. Koo Learning Action Learning , 1999 .

[2]  Ronald D. Snee,et al.  What's Missing in Statistical Education? , 1993 .

[3]  Kenzo Kurihara,et al.  Efficient Monte Carlo simulation method of GERT-type network for project management , 2002 .

[4]  Carol Ascher,et al.  Cooperative Education as a Strategy for School-to-Work Transition. , 1994 .

[5]  Dirk Seifert,et al.  Mutual customer approach: how industry and trade are executing collaborative customer relationship management , 2001 .

[6]  Doo Hun Lim,et al.  Trainee Perceptions of Factors that Influence Learning Transfer , 2002 .

[7]  Christoph H. Loch,et al.  Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..

[8]  Richard E. Hicks Experiential learning in a postgraduate project management programme , 1996 .

[9]  Stephen A. Stumpf,et al.  Microworlds and Simuworlds: Practice Fields for the Learning Organization , 1996 .

[10]  John S. Lamancusa,et al.  The Learning Factory—A New Approach to Integrating Design and Manufacturing into the Engineering Curriculum , 1997 .

[11]  Geoff Hayton,et al.  What drives enterprise training? Evidence from Australia , 1999 .

[12]  D. Kolb Experiential Learning: Experience as the Source of Learning and Development , 1983 .

[13]  Ting-Ya Hsieh,et al.  The economic implications of subcontracting practice on building prefabrication , 1997 .

[14]  Raymond Y. C. Tse,et al.  An empirical analysis of the barriers to implementing e‐commerce in small‐medium sized construction contractors in the state of Victoria, Australia , 2001 .

[15]  Andrew N. Baldwin,et al.  A Data Flow Model to Plan and Manage the Building Design Process , 1996 .

[16]  Alison Alker,et al.  Managing learning: what do we learn from a learning organisation? , 1998 .

[17]  F. Caeldries Reengineering the Corporation: A Manifesto for Business Revolution , 1994 .

[18]  Robert G. Cooper,et al.  Stage-gate systems: A new tool for managing new products , 1990 .

[19]  M. Porter Competitive Advantage: Creating and Sustaining Superior Performance , 1985 .

[20]  Robert K. Tener,et al.  Industry-University Partnerships for Construction Engineering Education , 1996 .

[21]  Vivian W. Y Tam,et al.  Implementation of environmental management in the Hong Kong construction industry , 2002 .

[22]  Lloyd Davies,et al.  Why kick the “L” out of “LEarning”? The development of students’ employability skills through part‐time working , 2000 .

[23]  David Gee,et al.  Analysing Clusters of Skills in R&D — Core Competencies, Metaphors, Visualization, and the Role of it , 1998 .

[24]  Graham Winch,et al.  How innovative is construction? Comparing aggregated data on construction innovation and other sectors – a case of apples and pears , 2003 .

[25]  Curba Morris Lampert,et al.  Entrepreneurship in the large corporation: a longitudinal study of how established firms create breakthrough inventions , 2001 .

[26]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[27]  E. Murphy,et al.  Technology‐enhanced learning: An Irish industry perspective , 2005 .

[28]  Christoph H. Loch,et al.  Communication and Uncertainty in Concurrent Engineering , 1998 .

[29]  Bridget N. O'Connor The workplace learning cycle: A problem‐based curriculum model for the preparation of workplace learning professionals , 2004 .

[30]  M Jamieson,et al.  Refocusing collaboration technologies in the construction value chain , 1996 .

[31]  Carlos Balaguer,et al.  Open Issues and Future Possibilities in the EU Construction Automation , 2000 .

[32]  Timothy T. Baldwin,et al.  TRANSFER OF TRAINING: A REVIEW AND DIRECTIONS FOR FUTURE RESEARCH , 1988 .

[33]  George Papagiannakis,et al.  Immersive VR decision training: telling interactive stories featuring advanced virtual human simulation technologies , 2003 .

[34]  Adrian. Sargeant Training for growth: how can education providers assist in the development of small businesses? , 1996 .

[35]  M. Knowles The Modern Practice of Adult Education: From Pedagogy to Andragogy , 1970 .

[36]  Raymond Y. C. Tse THE IMPLEMENTATION OF EMS IN CONSTRUCTION FIRMS: CASE STUDY IN HONG KONG , 2001 .

[37]  Gopal K. Kanji,et al.  Quality culture in the construction industry , 1998 .

[38]  Vivian W. Y Tam,et al.  Use of Prefabrication to Minimize Construction Waste - A Case Study Approach , 2005 .

[39]  Peter E.D. Love,et al.  Construction managers’ expectations and observations of graduates , 2001 .

[40]  A. Strauss Basics Of Qualitative Research , 1992 .

[41]  Iris D. Tommelein,et al.  Upstream Problem Solving Under Uncertainty and Ambiguity: Evidence From Airport Expansion Projects , 2008, IEEE Transactions on Engineering Management.

[42]  Yacine Rezgui,et al.  Paving the Way to the Vision of Digital Construction: A Strategic Roadmap , 2006 .

[43]  E. Blümel Pragmatic Approach to Apply Virtual Reality Technology in Accelerating a Product Life Cycle , 2004 .

[44]  Frank Biocca,et al.  Virtual Reality Technology: A Tutorial , 1992 .

[45]  A. Drejer Frameworks for the magement of technology: towards a contingent approach , 1996 .

[46]  G. Huber Organizational Learning: The Contributing Processes and the Literatures , 1991 .

[47]  Aaron J. Shenhar,et al.  Toward a typological theory of project management , 1996 .

[48]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[49]  Don T. Phillips,et al.  Fundamentals Of Network Analysis , 1981 .

[50]  Christine Wall,et al.  UK construction skills in the context of European developments , 1998 .

[51]  P. John Clarkson,et al.  Change and customisation in complex engineering domains , 2004 .

[52]  Jian Zuo,et al.  Project Culture within Construction Projects - A Pilot Case Study , 2006 .

[53]  Sai On Cheung,et al.  Site pre-cast yard layout arrangement through genetic algorithms , 2002 .

[54]  Christoph H. Loch,et al.  Measuring the Effectiveness of Overlapping Development Activities , 1999 .

[55]  M. Kumaraswamy Conflicts, claims and disputes in construction , 1997 .

[56]  Mustafa Alshawi,et al.  Generic and specific IT training: a process protocol model for construction , 2002 .

[57]  Maged Dessouky,et al.  A Virtual Factory Teaching System in Support of Manufacturing Education , 1998 .

[58]  Durward K. Sobek,et al.  Toyota's Principles of Set-Based Concurrent Engineering , 1999 .

[59]  Chi S. Poon,et al.  Management and Recycling of Demolition Waste in Hong Kong , 1997 .

[60]  Karl T. Ulrich,et al.  Product Design and Development , 1995 .

[61]  Serghei Floricel,et al.  Rising to the Challenge of Evolving High-Stakes Games , 2001 .

[62]  Carlos Balaguer,et al.  EU FutureHome Project Results , 2003 .

[63]  R. Felder,et al.  Learning and Teaching Styles in Engineering Education. , 1988 .

[64]  A. Strauss,et al.  The discovery of grounded theory: strategies for qualitative research aldine de gruyter , 1968 .

[65]  Lee W. Schruben,et al.  External Change in Large Engineering Design Projects: The Role of the Client , 2006, IEEE Transactions on Engineering Management.

[66]  Natasa Rupcic,et al.  The fifth discipline-the art and practice of the learning organisation , 2002 .

[67]  Rod Coombs,et al.  `Knowledge management practices' and path-dependency in innovation , 1998 .

[68]  Mike Parsons,et al.  Mastering the Dynamics of Innovation: How Companies Can Seize Opportunities in the Face of Technological Change. By James Utterback. Boston: Harvard Business School Press, 1996. 253 pp. ISBN: 0-875-84342-5 , 2007, Business History Review.

[69]  Derek Clements-Croome Creating the Productive Workplace , 1999 .

[70]  F. Krogt,et al.  Training in different types of organizations: differences and dynamics in the organization of learning at work , 1997 .

[71]  Stephen Kendall,et al.  Residential Open Building , 2000 .

[72]  Mohan M. Kumaraswamy Improving Industry Performance through Integrated Training Programs , 1997 .

[73]  Paul Humphreys,et al.  Pre‐construction project partnering: from adversarial to collaborative relationships , 2003 .

[74]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .

[75]  P. Senge THE FIFTH DISCIPLINE , 1997 .

[76]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[77]  Jian Zuo,et al.  Project Culture within Construction Projects: A Literature Review , 2005 .

[78]  P. A. Tanner,et al.  Monitoring environmental pollution in Hong Kong: trends and prospects , 1997 .

[79]  Peter McHardy,et al.  Closing the gap between what industry needs and what HE provides , 2000 .

[80]  Matt O'Connell TRAINING AS A POTENTIAL PROFIT CENTER , 1996 .

[81]  Catherine M. Sleezer,et al.  Training needs assessment at work: A dynamic process , 1993 .

[82]  Michael Schrage,et al.  Serious Play: How the World's Best Companies Simulate to Innovate , 1999 .

[83]  Keith D. Hampson,et al.  An example of developing a business model for information and communication technologies (ICT) adoption on construction projects – the National Museum of Australia project , 2003 .

[84]  Steffen Bayer,et al.  Business dynamics: Systems thinking and modeling for a complex world , 2004 .

[85]  Jeffrey S. Rosenthal,et al.  Active Learning Strategies in Advanced Mathematics Classes. , 1995 .

[86]  Maria Roussou,et al.  Learning by doing and learning through play: an exploration of interactivity in virtual environments for children , 2004, CIE.

[87]  C. Prahalad,et al.  The Core Competence of the Corporation , 1990 .

[88]  Will Hughes,et al.  Exposing the myth of the 1:5:200 ratio relating initial cost, maintenance and staffing costs of office buildings , 2004 .

[89]  Rosemary Harrison,et al.  External Consistency: The Key to Success in Management Development Programmes? , 1998 .

[90]  Steven D. Eppinger,et al.  Performance of Coupled Product Development Activities with a Deadline , 2001, Manag. Sci..

[91]  Felicity Kelliher,et al.  A learning framework for the small business environment , 2006 .

[92]  Davar Rezania,et al.  An evaluation system for training programs: a case study using a four‐phase approach , 2006 .

[93]  C. M. Tam,et al.  Cutting Construction Wastes by Prefabrication , 2006 .

[94]  Jan Venselaar,et al.  DESIGN RULES , 1999 .

[95]  Margaret Honey,et al.  A manual of learning styles , 1986 .

[96]  Brian Wood Approaching the care‐free building , 2003 .

[97]  Derek H.T. Walker,et al.  Procurement strategies : a relationship-based approach , 2003 .

[98]  Yossi Sheffi,et al.  The Resilient Enterprise: Overcoming Vulnerability for Competitive Advantage , 2005 .

[99]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[100]  Evert Gummesson,et al.  Broadening and Specifying Relationship Marketing , 1994 .

[101]  George Ofori,et al.  Enhancing integration and innovation in construction , 2002 .

[102]  Sandra Vandermerwe,et al.  The process of market-driven transformation , 1995 .

[103]  David. Proverbs,et al.  Construction time performance: an evaluation of contractors from Japan, the UK and the US , 2002 .

[104]  Ron Anjard Process mapping: a valuable tool for construction management and other professionals , 1998 .

[105]  R. M. Eastman Engineering information release prior to final design freeze , 1980, IEEE Transactions on Engineering Management.

[106]  Audley Genus Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel , 1997 .