Integrated production planning and order acceptance under uncertainty: A robust optimization approach
暂无分享,去创建一个
[1] David L. Woodruff,et al. Introduction to Computational Optimization Models for Production Planning in a Supply Chain , 2003 .
[2] Reha Uzsoy,et al. Using System Dynamics Simulations to Compare Capacity Models for Production Planning , 2006, Proceedings of the 2006 Winter Simulation Conference.
[3] A. Charnes,et al. Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints , 1963 .
[4] Arkadi Nemirovski,et al. Robust solutions of Linear Programming problems contaminated with uncertain data , 2000, Math. Program..
[5] Stephen C. Graves,et al. A Tactical Planning Model for a Job Shop , 1986, Oper. Res..
[6] Dimitris Bertsimas,et al. A Robust Optimization Approach to Inventory Theory , 2006, Oper. Res..
[7] Allen L. Soyster,et al. Technical Note - Convex Programming with Set-Inclusive Constraints and Applications to Inexact Linear Programming , 1973, Oper. Res..
[8] Reha Uzsoy,et al. Using a mathematical programming model to examine the marginal price of capacitated resources , 2011 .
[9] A. Charnes,et al. Chance-Constrained Programming , 1959 .
[10] Hubert Missbauer,et al. Aggregate order release planning for time-varying demand , 2002 .
[11] A. Srinivasan,et al. Resource Pricing And Aggregate Scheduling In Manufacturing Systems , 1988 .
[12] Stephen C. Graves,et al. Safety stocks in manufacturing systems , 1987 .
[13] R. Uzsoy,et al. Chance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times , 2012 .
[14] K.G. Kempf,et al. Control-oriented approaches to supply chain management in semiconductor manufacturing , 2004, Proceedings of the 2004 American Control Conference.
[15] David L. Woodruff,et al. Production planning with load dependent lead times , 2005, 4OR.
[16] A. Charnes,et al. Cost Horizons and Certainty Equivalents: An Approach to Stochastic Programming of Heating Oil , 1958 .
[17] Stephen C. H. Leung *,et al. A robust optimization model for stochastic aggregate production planning , 2004 .
[18] Reha Uzsoy,et al. Production planning with resources subject to congestion , 2009 .
[19] David D. Yao,et al. A Supply Network Model with Base-Stock Control and Service Requirements , 2000, Oper. Res..
[20] R. Peters,et al. Stochastic programming in production planning: a case with none-simple recourse , 1977 .
[21] Julia L. Higle,et al. Production Planning Under Supply and Demand Uncertainty: A Stochastic Programming Approach , 2010 .
[22] Melvyn Sim,et al. The Price of Robustness , 2004, Oper. Res..
[23] Joseph Geunes,et al. Requirements Planning with Pricing and Order Selection Flexibility , 2006, Oper. Res..
[24] Wallace J. Hopp,et al. Factory physics : foundations of manufacturing management , 1996 .
[25] J Figueira,et al. Stochastic Programming , 1998, J. Oper. Res. Soc..
[26] Costas D. Maranas,et al. Managing demand uncertainty in supply chain planning , 2003, Comput. Chem. Eng..
[27] Roger A. Blau,et al. Stochastic Programming and Decision Analysis: An Apparent Dilemma , 1974 .
[28] V. Cristina Ivanescu,et al. Makespan estimation and order acceptance in batch process industries when processing times are uncertain , 2002, OR Spectr..
[29] B. RAA,et al. A robust dynamic planning strategy for lot-sizing problems with stochastic demands , 2005, J. Intell. Manuf..
[30] R. Uzsoy,et al. Tractable nonlinear production planning models for semiconductor wafer fabrication facilities , 2006, IEEE Transactions on Semiconductor Manufacturing.
[31] Hubert Missbauer. Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept , 2011 .
[32] Susan A. Slotnick,et al. Order acceptance and scheduling: A taxonomy and review , 2011, Eur. J. Oper. Res..
[33] Stéphane Dauzère-Pérès,et al. Capacitated Multi-Item Lot-Sizing Problems with Time Windows , 2006, Oper. Res..
[34] Peter Kall,et al. Stochastic Programming , 1995 .
[35] John R. Birge,et al. Introduction to Stochastic Programming , 1997 .