Choosing the Optimal Technology to Rehabilitate the Pipes in Water Distribution Systems Using the AHP Method
暂无分享,去创建一个
George Sebastian Naghiu | Ioan Giurca | Ioan Aşchilean | Gheorghe Badea | Florin George Iloaie | Ioan Așchilean | I. Giurca | Gheorghe Badea | G. Naghiu
[1] Carlos A. Bana e Costa,et al. A critical analysis of the eigenvalue method used to derive priorities in AHP , 2008, Eur. J. Oper. Res..
[2] Thomas L. Saaty,et al. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .
[3] Barry J. Adams,et al. Water Distribution Network Renewal Planning , 2001 .
[4] Daniele B. Laucelli,et al. Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment , 2006 .
[5] Laurence Turcksin,et al. A Combined AHP-PROMETHEE Approach for Selecting the Most Appropriate Policy Scenario to Stimulate a Clean Vehicle Fleet , 2011 .
[6] George Sebastian Naghiu,et al. Multicriterial Analysis on Selecting Solar Radiation Concentration Ration for Photovoltaic Panels Using Electre-boldur Method , 2016 .
[7] Uri Shamir,et al. An Analytic Approach to Scheduling Pipe Replacement , 1979 .
[8] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[9] G. V. Loganathan,et al. Methodology for economically optimal replacement of pipes in water distribution systems: 1. Theory , 2002 .