Assessment of the Productivity of Nighttime Asphalt Paving Operations
暂无分享,去创建一个
Ali Mostafavi | Dulcy M. Abraham | Vanessa Valentin | Joseph Louis | A. Mostafavi | D. Abraham | Vanessa Valentin | Joseph Louis
[1] Jaideep Motwani,et al. Measuring construction productivity: a practical approach , 1995 .
[2] James H. Barnes. Cognitive biases and their impact on strategic planning , 1984 .
[3] Timothy R. B. Taylor,et al. Nighttime Construction Issues , 2001 .
[4] Ivica Završki,et al. Construction baseline productivity: Theory and practice , 1999 .
[5] Khaled Nassar,et al. Developing a Decision Support Tool for Nighttime Construction in Highway Projects , 2009 .
[6] D Kahneman,et al. On the reality of cognitive illusions. , 1996, Psychological review.
[7] Ivica Završki,et al. Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .
[8] Ralph D. Ellis,et al. ILLUMINATION GUIDELINES FOR NIGHTTIME HIGHWAY WORK , 2003 .
[9] Jeffrey S. Russell,et al. Improving Asphalt Paving Productivity , 1997 .
[10] Carl-Axel S. Staël von Holstein,et al. Exceptional Paper---Probability Encoding in Decision Analysis , 1975 .
[11] Thomas L. Saaty,et al. Decision-making with the AHP: Why is the principal eigenvector necessary , 2003, Eur. J. Oper. Res..
[12] Lingguang Song,et al. Measuring and Modeling Labor Productivity Using Historical Data , 2008 .
[13] Fred L. Mannering,et al. Weekend Closure for Construction of Asphalt Overlay on Urban Highway , 2000 .
[14] David R. Riley,et al. Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .
[15] Jesus M. de la Garza,et al. CONSEQUENTIAL EQUIPMENT COSTS ASSOCIATED WITH LACK OF AVAILABILITY AND DOWNTIME , 1990 .
[16] Tarek Zayed,et al. Modeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems , 2007 .
[17] A. Tversky,et al. Judgment under Uncertainty: Heuristics and Biases , 1974, Science.
[18] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[19] Daniel W. Halpin,et al. QUANTITATIVE ASSESSMENT FOR PILES PRODUCTIVITY FACTORS , 2004 .
[20] Jaehyun Choi,et al. Workflow management and productivity control for asphalt pavement operations , 2006 .
[21] Julio C. Martinez. Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management , 2010 .
[22] H. Randolph Thomas,et al. Quantitative Effects of Construction Changes on Labor Productivity , 1995 .
[23] Richard L. Tucker,et al. Multiskilled Labor Utilization Strategies in Construction , 1998 .
[24] Iris D. Tommelein,et al. Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .
[25] Edward T. Harrigan,et al. NAtioNAl CooperAtive HigHwAy reseArCH progrAm , 2013 .