Assessment of the Productivity of Nighttime Asphalt Paving Operations

AbstractPerforming highway construction operations during nighttime hours has emerged as a response to traffic congestions caused by daytime lane closures. Work zone conditions at night may be different from those during the day, and nighttime factors that affect project metrics (i.e., safety, quality, and productivity) should be carefully considered during the planning of nighttime projects. Currently, there is no methodology for quantifying the effects of nighttime factors on the productivity of construction operations. The objective of this study therefore is to create such a methodology, specifically for asphalt paving projects, focusing on visibility, personnel fatigue, and glare. The methodology is demonstrated using an example case. First, nighttime qualitative (subjective) factors affecting the productivity of asphalt paving operations are identified. A productivity index (PI) is then estimated to account for these factors. The PI value is subsequently used to modify the baseline productivity simu...

[1]  Jaideep Motwani,et al.  Measuring construction productivity: a practical approach , 1995 .

[2]  James H. Barnes Cognitive biases and their impact on strategic planning , 1984 .

[3]  Timothy R. B. Taylor,et al.  Nighttime Construction Issues , 2001 .

[4]  Ivica Završki,et al.  Construction baseline productivity: Theory and practice , 1999 .

[5]  Khaled Nassar,et al.  Developing a Decision Support Tool for Nighttime Construction in Highway Projects , 2009 .

[6]  D Kahneman,et al.  On the reality of cognitive illusions. , 1996, Psychological review.

[7]  Ivica Završki,et al.  Reducing Variability to Improve Performance as a Lean Construction Principle , 2002 .

[8]  Ralph D. Ellis,et al.  ILLUMINATION GUIDELINES FOR NIGHTTIME HIGHWAY WORK , 2003 .

[9]  Jeffrey S. Russell,et al.  Improving Asphalt Paving Productivity , 1997 .

[10]  Carl-Axel S. Staël von Holstein,et al.  Exceptional Paper---Probability Encoding in Decision Analysis , 1975 .

[11]  Thomas L. Saaty,et al.  Decision-making with the AHP: Why is the principal eigenvector necessary , 2003, Eur. J. Oper. Res..

[12]  Lingguang Song,et al.  Measuring and Modeling Labor Productivity Using Historical Data , 2008 .

[13]  Fred L. Mannering,et al.  Weekend Closure for Construction of Asphalt Overlay on Urban Highway , 2000 .

[14]  David R. Riley,et al.  Loss of Labor Productivity due to Delivery Methods and Weather , 1999 .

[15]  Jesus M. de la Garza,et al.  CONSEQUENTIAL EQUIPMENT COSTS ASSOCIATED WITH LACK OF AVAILABILITY AND DOWNTIME , 1990 .

[16]  Tarek Zayed,et al.  Modeling the Effect of Subjective Factors on Productivity of Trenchless Technology Application to Buried Infrastructure Systems , 2007 .

[17]  A. Tversky,et al.  Judgment under Uncertainty: Heuristics and Biases , 1974, Science.

[18]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[19]  Daniel W. Halpin,et al.  QUANTITATIVE ASSESSMENT FOR PILES PRODUCTIVITY FACTORS , 2004 .

[20]  Jaehyun Choi,et al.  Workflow management and productivity control for asphalt pavement operations , 2006 .

[21]  Julio C. Martinez Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management , 2010 .

[22]  H. Randolph Thomas,et al.  Quantitative Effects of Construction Changes on Labor Productivity , 1995 .

[23]  Richard L. Tucker,et al.  Multiskilled Labor Utilization Strategies in Construction , 1998 .

[24]  Iris D. Tommelein,et al.  Improving Labor Flow Reliability for Better Productivity as Lean Construction Principle , 2003 .

[25]  Edward T. Harrigan,et al.  NAtioNAl CooperAtive HigHwAy reseArCH progrAm , 2013 .