Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies

AbstractThe engineering-procurement-construction (EPC) approach has been increasingly adopted in competitive international markets, in which design management is critical to project performances. Existing studies have embraced a partnering strategy to integrate stakeholders’ diverse expertise and need for better solutions to design. This study has quantitatively investigated the cause-effect relationships among partnering, design management, and project outcomes by developing and testing a conceptual model. With the support of data collected from Chinese construction companies as EPC contractors, this study reveals that contractors’ design management should focus on four factors: planning and executing, resolving disputes, optimizing design, and promoting techniques . Path analysis confirms that partnering can not only significantly facilitate design management, thereby improving project outcomes, but also directly promote project performances and create long-term strategic benefits. Canonical correlation...

[1]  Ossama Salem,et al.  Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects , 2012 .

[2]  Gerhard Girmscheid,et al.  Inter- and Intraorganizational Trust in International Construction Joint Ventures , 2010 .

[3]  Sai On Cheung,et al.  Examining the Relationship between Organizational Learning Styles and Project Performance , 2009 .

[4]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[5]  Mohan M. Kumaraswamy,et al.  Conceptual Model of Partnering and Alliancing , 2007 .

[6]  Islam H. El-adaway Guidelines for a Standard Project Partnering Contract , 2010 .

[7]  K. T. Yeo,et al.  Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects , 2002 .

[8]  Panagiotis Mitropoulos,et al.  New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment , 2011 .

[9]  Alfred E. Thal,et al.  Analysis of the Design-Build Delivery Method in Air Force Construction Projects , 2009 .

[10]  Patricia Galloway Design-Build/EPC Contractor's Heightened Risk—Changes in a Changing World , 2009 .

[11]  Albert P.C. Chan,et al.  Developing a Performance Index for Relationship-Based Construction Projects in Australia: Delphi Study , 2009 .

[12]  Chuan Chen,et al.  Chinese Contractors in Africa: Home Government Support, Coordination Mechanisms, and Market Entry Strategies , 2009 .

[13]  Peter E.D. Love,et al.  Probabilistic Assessment of Design Error Costs , 2014 .

[14]  Cliff Schexnayder,et al.  ONE COMPANY'S EXPERIENCE WITH DESIGN/BUILD: LABOR COST RISK AND PROFIT POTENTIAL , 2000 .

[15]  Albert P.C. Chan Evaluation of enhanced design and build system a case study of a hospital project , 2000 .

[16]  Zhonghui Wang,et al.  Managing Design Changes for Multiview Models , 2001 .

[17]  Colin Duffield,et al.  Enhancing Total Quality Management by Partnering in Construction , 2009 .

[18]  David Grau,et al.  Benefits of On-Site Design to Project Performance Measures , 2012 .

[19]  Yasser Mohamed,et al.  Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance , 2009 .

[20]  Albert P.C. Chan,et al.  Critical Analysis of Partnering Research Trend in Construction Journals , 2012 .

[21]  Wenzhe Tang,et al.  Relationship between Owners’ Capabilities and Project Performance on Development of Hydropower Projects in China , 2013 .

[22]  Colin Duffield,et al.  Incentives in the Chinese construction industry , 2008 .

[23]  Francis G. N. Li Hydropower in China , 2002 .

[24]  L. Guion Triangulation: Establishing the Validity of Qualitative Studies , 2002 .

[25]  Steve R. Sanders,et al.  PEER-REVIEWED PAPER:Partnering Continuum , 1998 .

[26]  Lei Zhang,et al.  Utility-Function Model for Engineering Performance Assessment , 2005 .

[27]  Peter E.D. Love,et al.  Influence of organizational and project practices on design error costs , 2014 .

[28]  David Arditi,et al.  Constructability Analysis in the Design Firm , 2002 .

[29]  Patrick T.I. Lam,et al.  Contributions of designers to improving buildability and constructability , 2006 .

[30]  Michael J. Horman,et al.  Organizing Constructability Knowledge for Design , 2005 .

[31]  Mohammadreza Parsanejad,et al.  A Comparative Framework for Measuring Project Success , 2012 .

[32]  Michael E. Roos,et al.  Building "Constructability" into the Design , 2012 .

[33]  G. Edward Gibson,et al.  Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods , 2009 .

[34]  Peter E.D. Love,et al.  Design Error Costs in Construction Projects , 2012 .

[35]  S. H. Bok,et al.  Process-Parameter-Interface Model for Design Management , 2003 .

[36]  Colin Duffield,et al.  Risk management in the Chinese construction industry , 2007 .

[37]  Luis F. Alarcón,et al.  Selection of Third Party Relationships in Construction , 2014 .

[38]  Sun Kai-feng Top 225 International Contractors in 2011 ENR Report , 2011 .

[39]  Peter T. Martin,et al.  Comparative Analysis of Travel Impacts between the Design-Build and Traditional Building Methods , 2005 .

[40]  Henry J. Schultzel,et al.  Successful Partnering: Fundamentals for Project Owners and Contractors , 1996 .

[41]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[42]  Liang Y Liu,et al.  Design Review Checking System with Corporate Lessons Learned , 2003 .

[43]  Chang-Taek Hyun,et al.  Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea , 2010 .

[44]  Sai On Cheung,et al.  Behavioral aspects in construction partnering , 2003 .

[45]  A. Shenhar,et al.  The relative importance of project success dimensions , 1997 .

[46]  X. Chang,et al.  Hydropower in China at present and its further development , 2010 .

[47]  John Shawe-Taylor,et al.  Canonical Correlation Analysis: An Overview with Application to Learning Methods , 2004, Neural Computation.

[48]  Peter E.D. Love,et al.  Design Error Classification, Causation, and Prevention in Construction Engineering , 2010 .

[49]  Heng Li,et al.  Construction Partnering Process and Associated Critical Success Factors: Quantitative Investigation , 2002 .

[50]  Akintola Akintoye,et al.  An analysis of success factors and benefits of partnering in construction , 2000 .

[51]  Albert P.C. Chan,et al.  Framework of Success Criteria for Design/Build Projects , 2002 .

[52]  Peter E.D. Love,et al.  Triangulation in construction management research , 2002 .

[53]  Albert P.C. Chan,et al.  Design Management in Design and Build Projects: The New Role of the Contractor , 2005 .

[54]  A. Kadefors Trust in project relationships-inside the black box , 2004 .

[55]  Mattias Jacobsson,et al.  Towards a shift in mindset: partnering projects as engagement platforms , 2014 .

[56]  Colin Duffield,et al.  Partnering mechanism in construction: An empirical study on the Chinese construction industry , 2006 .