The Future of Swiss Hydropower - A Review on Drivers and Uncertainties

Swiss Hydropower (HP) is currently facing a wide range of challenges that have initiated a debate about future prospects and its role within the envisioned energy transition. Building on this debate, this paper provides an overview of the status and prospects of Swiss HP by identifying and evaluating the different drivers and uncertainties that Swiss HP faces. Based on a review and the perceptions held by some of the main Swiss HP stakeholders the two main topics that need to be addressed are the market driven impacts and the political, legal and social aspects. While the market dynamics cannot directly be influenced by Swiss companies or authorities, the regulatory framework can and needs to be adjusted. However, this requires a comprehensive stakeholder process and is at least a medium-term process.

[1]  Peizhen Zhang,et al.  Increased sedimentation rates and grain sizes 2–4 Myr ago due to the influence of climate change on erosion rates , 2001, Nature.

[2]  A. Bond,et al.  Sustainability assessment: the state of the art , 2012 .

[3]  Xixi Lu,et al.  Sediment flux sensitivity to climate change: A case study in the Longchuanjiang catchment of the upper Yangtze River, China , 2008 .

[4]  J. Glachant,et al.  Regimes for granting the right to use hydropower in Europe , 2014 .

[5]  Areti Kontogianni,et al.  Planning globally, protesting locally: Patterns in community perceptions towards the installation of wind farms , 2014 .

[6]  Giovanni Ravazzani,et al.  Climate Change Impacts on Hydropower in the Swiss and Italian Alps , 2014, The Science of the total environment.

[7]  Lutz E. Schlange Stakeholder Identification in Sustainability Entrepreneurship , 2006 .

[8]  Ronald D. Lile,et al.  Assessing Sustainability: Some Conceptual and Empirical Challenges , 1998 .

[9]  Ludovic Gaudard,et al.  Pumped-Storage Project: A Short to Long Term Investment Analysis Including Climate Change , 2015 .

[10]  Muel Kaptein,et al.  Toward Effective Stakeholder Dialogue , 2003 .

[11]  Stein-Erik Fleten,et al.  Short-term hydropower production planning by stochastic programming , 2008, Comput. Oper. Res..

[12]  Werner Hediger,et al.  Welfare and capital-theoretic foundations of corporate social responsibility and corporate sustainability , 2010 .

[13]  Martin Beniston,et al.  Impacts of climatic change on water and associated economic activities in the Swiss Alps , 2012 .

[14]  Franco Romerio,et al.  The Future of Hydropower in Europe: Interconnecting Climate, Markets and Policies , 2014 .

[15]  Hannes Weigt,et al.  Linking Europe: The Role of the Swiss Electricity Transmission Grid until 2050 , 2014 .

[16]  Massimo Filippini,et al.  An estimation of the Swiss hydropower rent , 2005 .

[17]  F. Kunz,et al.  Current and Prospective Costs of Electricity Generation until 2050 , 2013 .

[18]  Bernhard Lehner,et al.  The impact of global change on the hydropower potential of Europe: a model-based analysis , 2005 .

[19]  Anton Schleiss Sedimentation of reservoirs , 2013 .

[20]  Chuntian Cheng,et al.  Short-Term Hydroscheduling with Discrepant Objectives Using Multi-Step Progressive Optimality Algorithm1 , 2012 .

[21]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[22]  Yasser M. Ahmed,et al.  Operation, performance and economic analysis of low head micro-hydropower turbines for rural and remote areas: A review , 2015 .

[23]  Andrew Ford,et al.  Cycles in competitive electricity markets: a simulation study of the western United States , 1999 .

[24]  Santiago Grijalva,et al.  Prosumer-based smart grid architecture enables a flat, sustainable electricity industry , 2011, ISGT 2011.

[25]  David Kilama Okot,et al.  Review of small hydropower technology , 2013 .

[26]  Liping Wang,et al.  Self-Optimization Simulation Model of Short-Term Cascaded Hydroelectric System Dispatching Based on the Daily Load Curve , 2013, Water Resources Management.

[27]  Massimo Filippini,et al.  Kostenstruktur und Kosteneffizienz der Schweizer Wasserkraft: Schlussbericht , 2014 .

[28]  Ying Zheng,et al.  Evaluation of Power Generation Efficiency of Cascade Hydropower Plants: A Case Study , 2013 .

[29]  Johanna Cludius,et al.  The merit order effect of wind and photovoltaic electricity generation in Germany 2008–2016: Estimation and distributional implications , 2014 .

[30]  Paul L. Joskow,et al.  Capacity payments in imperfect electricity markets: Need and design , 2008 .

[31]  Manfred Gilli,et al.  Climate Change Impacts on Hydropower Management , 2013, Water Resources Management.

[32]  Eefje Cuppen,et al.  Diversity and constructive conflict in stakeholder dialogue: considerations for design and methods , 2012 .

[33]  D. Wheeler,et al.  Including the stakeholders: The business case , 1998 .

[34]  I. MacGill Electricity market design for facilitating the integration of wind energy: Experience and prospects with the Australian National Electricity Market , 2010 .

[35]  Paul Breeze Power Generation Technologies Ed. 2 , 2014 .

[36]  J. Fuhrer,et al.  Governing and managing water resources under changing hydro-climatic contexts: The case of the upper Rhone basin , 2014 .

[37]  Juan I. Pérez-Díaz,et al.  Short-term operation scheduling of a hydropower plant in the day-ahead electricity market , 2010 .

[38]  J. Apt,et al.  The effects of bulk electricity storage on the PJM market , 2014 .

[39]  Christoph Böhringer,et al.  Green promotes the dirtiest: on the interaction between black and green quotas in energy markets , 2010 .

[40]  Leonhard Müller Handbuch der Elektrizitätswirtschaft , 1998 .

[41]  S. Scrieciu,et al.  The inherent dangers of using computable general equilibrium models as a single integrated modelling framework for sustainability impact assessment. A critical note on Bohringer and Loschel (2006) , 2007 .