Shipping Liner Company Stowage Plans: An Optimization Approach

The problem of determining the stowage plan for each port included in the circular route of a containership is the planning problem daily faced by the shipping line coordinator (SC). The SC has to determine how to stow in each port a given set of containers into bay locations, either on the deck or in the hold, in order to satisfy some structural and operational constraints, all the transport demand and minimize the ship berthing time. The time spent by the ship at the ports is minimized when the SC defines a stowage plan that avoids re-handles, balances the workload of the cranes working in parallel at each port and requires to open and close hatches the least possible when moving containers in the holds. We propose a new MIP formulation, and a MIP heuristics for finding stowage plans for containerships up to 18000 TEUs. Moreover, the new formulation includes new and more accurate stability conditions.

[1]  Laurence A. Wolsey,et al.  Production Planning by Mixed Integer Programming , 2010 .

[2]  Anna Sciomachen,et al.  A new three-step heuristic for the Master Bay Plan Problem , 2009 .

[3]  Marshall Conley,et al.  Canadian shipping policies and the United Nations Conference on Trade and Development: an analysis of UNCTAD V , 1982 .

[4]  Rune Møller Jensen,et al.  On the complexity of container stowage planning problems , 2014, Discret. Appl. Math..

[5]  Stefan Voß,et al.  Operations research at container terminals: a literature update , 2007, OR Spectr..

[6]  Alberto Delgado,et al.  An Accurate Model for Seaworthy Container Vessel Stowage Planning with Ballast Tanks , 2012, ICCL.

[7]  Stefan Voß,et al.  Container terminal operation and operations research — a classification and literature review , 2004 .

[8]  Anna Sciomachen,et al.  Computational evaluation of a MIP model for multi-port stowage planning problems , 2017, Soft Comput..

[9]  I. D. Wilson,et al.  Container stowage planning: a methodology for generating computerised solutions , 2000, J. Oper. Res. Soc..

[10]  Maria Flavia Monaco,et al.  The Terminal-Oriented Ship Stowage Planning Problem , 2014, Eur. J. Oper. Res..

[11]  W. K. Talley,et al.  Maritime transport chain choice by carriers, ports and shippers , 2013 .

[12]  Henrik Andersson,et al.  Containership Routing and Scheduling in Liner Shipping: Overview and Future Research Directions , 2014, Transp. Sci..

[13]  Akio Imai,et al.  Marine container terminal configurations for efficient handling of mega-containerships , 2013 .

[14]  Edward Tsang,et al.  Novel constraints satisfaction models for optimization problems in container terminals , 2013 .

[15]  Anna Sciomachen,et al.  A MIP Heuristic for Multi Port Stowage Planning , 2015 .

[16]  V. Caglar Sustainable Container Terminal Operations: Challenges and Enhancements , 2016 .

[17]  Paul A. Roach,et al.  Container stowage pre-planning: using search to generate solutions, a case study , 2001, Knowl. Based Syst..

[18]  B. Slack,et al.  The Geography of Transport Systems , 2006 .

[19]  Alberto Delgado,et al.  Fast Generation of Near-Optimal Plans for Eco-Efficient Stowage of Large Container Vessels , 2011, ICCL.