A survey of case studies in production scheduling: Analysis and perspectives
暂无分享,去创建一个
[1] Horacio Hideki Yanasse,et al. Programação da produção de gabaritos de montagem com restrições de adjacência na indústria aeronáutica , 2011 .
[2] Michele Lanzetta,et al. Hybrid stage shop scheduling , 2015, Expert Syst. Appl..
[3] Dong-Ho Lee,et al. Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line , 2011, Expert Syst. Appl..
[4] Pedro M. Castro,et al. Scope for industrial applications of production scheduling models and solution methods , 2014, Comput. Chem. Eng..
[5] Jingyao Li,et al. A branch population genetic algorithm for dual-resource constrained job shop scheduling problem , 2016, Comput. Ind. Eng..
[6] Ada Che,et al. An efficient greedy insertion heuristic for energy-conscious single machine scheduling problem under time-of-use electricity tariffs , 2016 .
[7] Quan-Ke Pan,et al. Solving the steelmaking casting problem using an effective fruit fly optimisation algorithm , 2014, Knowl. Based Syst..
[8] Sanja Petrovic,et al. An investigation into minimising total energy consumption and total weighted tardiness in job shops , 2014 .
[9] Chelliah Sriskandarajah,et al. A review of TSP based approaches for flowshop scheduling , 2006, Eur. J. Oper. Res..
[10] Vincent T'Kindt,et al. Scheduling batches in flowshop with limited buffers in the shampoo industry , 2012, Eur. J. Oper. Res..
[11] Jatinder N. D. Gupta,et al. Flowshop scheduling research after five decades , 2006, Eur. J. Oper. Res..
[12] Immaculada Ribas Vila,et al. A hybrid flow shop model for an ice cream production scheduling problem , 2009 .
[13] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[14] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[15] Rubén Ruiz,et al. A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime , 2013, Comput. Oper. Res..
[16] Uwe Schwiegelshohn,et al. Towards understanding uncertainty in cloud computing with risks of confidentiality, integrity, and availability , 2016, J. Comput. Sci..
[17] Wojciech Bozejko,et al. Parallel tabu search algorithm for the hybrid flow shop problem , 2013, Comput. Ind. Eng..
[18] Thom J. Hodgson,et al. Scheduling non-similar groups on a flow line: multiple group setups , 2004 .
[19] Reinaldo Morabito,et al. Solution approaches for the soft drink integrated production lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..
[20] Taho Yang,et al. An evolutionary simulation-optimization approach in solving parallel-machine scheduling problems - A case study , 2009, Comput. Ind. Eng..
[21] James C. Chen,et al. Flexible job shop scheduling with parallel machines using Genetic Algorithm and Grouping Genetic Algorithm , 2012, Expert Syst. Appl..
[22] Jirachai Buddhakulsomsiri,et al. Simulation modeling and analysis for production scheduling using real-time dispatching rules: A case study in canned fruit industry , 2010 .
[23] Joaquín B. Ordieres Meré,et al. Optimizing the production scheduling of a single machine to minimize total energy consumption costs , 2014 .
[24] Rubén Ruiz,et al. A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility , 2006, European Journal of Operational Research.
[25] Wenqiang Sun,et al. Optimization and scheduling of byproduct gas system in steel plant , 2015 .
[26] Pei-Chann Chang,et al. A hybrid genetic algorithm for the job shop scheduling problem with practical considerations for manufacturing costs: Investigations motivated by vehicle production , 2013 .
[27] Jiyin Liu,et al. Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling , 1993 .
[28] Manuel Mucientes,et al. Machine scheduling in custom furniture industry through neuro-evolutionary hybridization , 2011, Appl. Soft Comput..
[29] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[30] Pierre Lopez,et al. The energy scheduling problem: Industrial case-study and constraint propagation techniques , 2013 .
[31] Taïcir Loukil,et al. A multi-objective production scheduling case study solved by simulated annealing , 2007, Eur. J. Oper. Res..
[32] Paulo Sandroni. Dicionário de economia , 1987 .
[33] Michael Pinedo,et al. PRACTICE‐FOCUSED RESEARCH ISSUES FOR SCHEDULING SYSTEMS* , 2002 .
[34] Kenli Li,et al. A DAG task scheduling scheme on heterogeneous cluster systems using discrete IWO algorithm , 2016, J. Comput. Sci..
[35] George Q. Huang,et al. Multi-agent based real-time production scheduling method for radio frequency identification enabled ubiquitous shopfloor environment , 2014, Comput. Ind. Eng..
[36] Xin-She Yang,et al. Improved cuckoo search algorithm for hybrid flow shop scheduling problems to minimize makespan , 2014, Appl. Soft Comput..
[37] Reinaldo Morabito,et al. Production scheduling of assembly fixtures in the aeronautical industry , 2014, Comput. Ind. Eng..
[38] Serge Domenech,et al. Multiobjective scheduling for semiconductor manufacturing plants , 2010, Comput. Chem. Eng..
[39] Maciej Drwal,et al. Complexity of interval minmax regret scheduling on parallel identical machines with total completion time criterion , 2014, Oper. Res. Lett..
[40] Salah E. Elmaghraby,et al. SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES , 2009 .
[41] Lin Li,et al. A multi-level optimization approach for energy-efficient flexible flow shop scheduling , 2016 .
[42] P. S. Sundararaghavan,et al. Minimizing makespan in parallel flowshops , 1997 .
[43] Cheng Wu,et al. Carbon-efficient scheduling of flow shops by multi-objective optimization , 2016, Eur. J. Oper. Res..
[44] Hlynur Stefansson,et al. Production , Manufacturing and Logistics Discrete and continuous time representations and mathematical models for large production scheduling problems : A case study from the pharmaceutical industry , 2011 .
[45] Ching-Jen Huang,et al. Parallel machines scheduling with machine preference via agent-based approach , 2014, Appl. Math. Comput..
[46] George Q. Huang,et al. A Branch-and-Bound Algorithm for Minimizing the Energy Consumption in the PFS Problem , 2013 .
[47] Rolf Hermann Erdmann,et al. Uma abordagem heurística para a programação da produção na indústria de fundição com utilização da lógica fuzzy , 2011 .
[48] Thomas E. Morton,et al. Heuristic scheduling systems : with applications to production systems and project management , 1993 .
[49] Bassem Jarboui,et al. Combinatorial particle swarm optimization for solving blocking flowshop scheduling problem , 2016, J. Comput. Des. Eng..
[50] Shijin Wang,et al. Bi-objective optimization of a single machine batch scheduling problem with energy cost consideration , 2016 .
[51] Chase Rainwater,et al. Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals , 2016, Eur. J. Oper. Res..
[52] T.C.E. Cheng,et al. A state-of-the-art review of parallel-machine scheduling research , 1990 .
[53] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[54] Henry Yuliando,et al. Production Scheduling Using Mixed Integer Programming: Case of Bread Small and Medium Enterprise at Yogyakarta , 2015 .
[55] Jose M. Framiñan,et al. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective , 2010, Comput. Oper. Res..
[56] Gang Li,et al. MILP Model for Plant-Wide Optimal By-Product Gas Scheduling in Iron and Steel Industry , 2010 .
[57] Donya Rahmani,et al. A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study , 2016, Comput. Ind. Eng..
[58] Chris N. Potts,et al. Fifty years of scheduling: a survey of milestones , 2009, J. Oper. Res. Soc..
[59] Raymond Chiong,et al. Solving the energy-efficient job shop scheduling problem: a multi-objective genetic algorithm with enhanced local search for minimizing the total weighted tardiness and total energy consumption , 2016 .
[60] Thiago Henrique Nogueira,et al. Integrated lot sizing and production scheduling formulations: an application in a refractory cement industry , 2016 .
[61] Luis Puigjaner,et al. MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry , 2010, Eur. J. Oper. Res..
[62] John W. Fowler,et al. Scheduling of unrelated parallel machines: an application to PWB manufacturing , 2002 .
[63] Ramón Alvarez-Valdés,et al. A heuristic to schedule flexible job-shop in a glass factory , 2005, Eur. J. Oper. Res..
[64] Thomas Becker,et al. Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery , 2014, Expert Syst. Appl..
[65] Jing Liu,et al. A survey of scheduling problems with setup times or costs , 2008, Eur. J. Oper. Res..
[66] Fernanda de Freitas Alves,et al. Modelos integrados de dimensionamento e sequenciamento da produção: aplicação em uma fábrica de cimento para refratário , 2016 .
[67] Danyu Bai,et al. Permutation flowshop group scheduling with position-based learning effect , 2016, Comput. Ind. Eng..
[68] Jinwoo Park,et al. A hybrid genetic algorithm for the hybrid flow shop scheduling problem with nighttime work and simultaneous work constraints: A case study from the transformer industry , 2015, Expert Syst. Appl..
[69] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[70] James T. Lin,et al. Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing , 2015, Simul. Model. Pract. Theory.
[71] Nélio Domingues Pizzolato,et al. O problema do seqüenciamento da produção em uma indústria química: avaliação de uma aplicação real , 1999 .
[72] S. Afshin Mansouri,et al. Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption , 2016, Eur. J. Oper. Res..
[73] Donghe Pei,et al. Cusps of Bishop Spherical Indicatrixes and Their Visualizations , 2013 .
[74] Maria Antónia Carravilla,et al. Production planning and scheduling in the glass container industry: A VNS approach , 2008 .
[75] Luis Puigjaner,et al. Efficient mathematical frameworks for detailed production scheduling in food processing industries , 2012, Comput. Chem. Eng..
[76] Jose M. Framiñan,et al. A review and classification of heuristics for permutation flow-shop scheduling with makespan objective , 2004, J. Oper. Res. Soc..
[77] Mohamed Benrejeb,et al. A Proposed Genetic Algorithm Coding for Flow-Shop Scheduling Problems , 2007, Int. J. Comput. Commun. Control.
[78] Yin-Yann Chen,et al. A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems—A case study for solar cell industry , 2013 .
[79] Paolo Serafini,et al. Production scheduling problems in a textile industry , 1992 .
[80] Mehmet Mutlu Yenisey,et al. Scheduling Practice and Recent Developments in Flow Shop and Job Shop Scheduling , 2009 .
[81] Ruhul A. Sarker,et al. Production , Manufacturing and Logistics A real-time order acceptance and scheduling approach for permutation flow shop problems , 2015 .
[82] Hans-Otto Günther,et al. Scheduling of a multi-product batch process in the chemical industry , 1998 .
[83] Ching-Jong Liao,et al. A case study in a two-stage hybrid flow shop with setup time and dedicated machines , 2003 .
[84] Ali Allahverdi,et al. Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times , 2017 .
[85] Christoph H. Glock,et al. Decision support models for managing returnable transport items in supply chains: A systematic literature review , 2017 .
[86] Deming Lei,et al. Multi-objective production scheduling: a survey , 2009 .
[87] Elankovan Sundararajan,et al. A parallel membrane inspired harmony search for optimization problems: A case study based on a flexible job shop scheduling problem , 2016, Appl. Soft Comput..
[88] H Tsubone,et al. A production scheduling system for a hybrid flow shop--a case study , 1993 .
[89] George Q. Huang,et al. Hybrid flow shop scheduling considering machine electricity consumption cost , 2013 .
[90] Jung Woo Jung,et al. Flowshop-scheduling problems with makespan criterion: a review , 2005 .
[91] Tomasz Gawronski. Optimization of setup times in the furniture industry , 2012, Ann. Oper. Res..
[92] Wai Keung Wong,et al. Mathematical model and genetic optimization for the job shop scheduling problem in a mixed- and multi-product assembly environment: A case study based on the apparel industry , 2006, Comput. Ind. Eng..
[93] Abdelkabir Charkaoui,et al. An MILP Model for Scheduling Multistage, Multiproducts Milk Processing , 2016 .
[94] John W. Sutherland,et al. A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction , 2011 .