Scheduling optimization of a flexible manufacturing system using a modified NSGA-II algorithm
暂无分享,去创建一个
[1] C.S.P. Rao,et al. Simultaneous scheduling of machines and vehicles in an FMS environment with alternative routing , 2011 .
[2] Chandrasekharan Rajendran,et al. A multiobjective genetic algorithm for scheduling a flexible manufacturing system , 2003 .
[3] F. Y. Nakamoto. RESOURCES ALLOCATION CONTROL IN FLEXIBLE MANUFACTURING SYSTEMS USING THE DEADLOCK AVOIDANCE METHOD , 2007 .
[4] R. Saravanan,et al. Scheduling Optimization of FMS Using NSGA-II , 2014 .
[5] Frank DiCesare,et al. Scheduling flexible manufacturing systems using Petri nets and heuristic search , 1994, IEEE Trans. Robotics Autom..
[6] C. F. Jian,et al. BATCH TASK SCHEDULING-ORIENTED OPTIMIZATION MODELLING AND SIMULATION IN CLOUD MANUFACTURING , 2014 .
[7] Aysegul Toker,et al. Job Shop Scheduling under a Non-Renewable Resource Constraint , 1994 .
[8] Timothy J. Greene,et al. A simulation analysis of controlling rules for flexible pull systems , 2006, Int. J. Manuf. Res..
[9] A. Noorul Haq,et al. Evaluation of scatter-search approach for scheduling optimization of flexible manufacturing systems , 2008 .
[10] David Sinreich,et al. Controlling flexible manufacturing systems based on a dynamic selection of the appropriate operational criteria and scheduling policy , 2006 .
[11] R. K. Ursem. Multi-objective Optimization using Evolutionary Algorithms , 2009 .
[12] R. Saravanan,et al. FMS SCHEDULING OPTIMIZATION USING MODIFIED NSGA-II NIDHISH , 2014 .
[13] S. Kumanan,et al. Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm , 2010 .
[14] B. Durga Prasad,et al. Optimization of Fms Scheduling Using Non-Traditional Techniques , 2010 .
[15] Manoj Kumar Tiwari,et al. Solving machine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach , 2000 .
[16] Manoj Kumar Tiwari,et al. Scheduling of flexible manufacturing systems: An ant colony optimization approach , 2003 .
[17] C. S. P Rao,et al. FLEXIBLE MANUFACTURING SYSTEMS MODELLING AND PERFORMANCE EVALUATION USING AUTOMOD , 2011 .
[18] Andrew Kusiak,et al. Scheduling manufacturing systems , 1992 .
[19] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[20] Krishna R. Pattipati,et al. A practical approach to job-shop scheduling problems , 1993, IEEE Trans. Robotics Autom..
[21] Wing-Keung Wong,et al. A genetic-algorithm-based optimization model for scheduling flexible assembly lines , 2008 .
[22] R. Saravanan,et al. Scheduling optimisation of flexible manufacturing systems using particle swarm optimisation algorithm , 2005 .
[23] Sankha Deb,et al. Scheduling optimization of flexible manufacturing system using cuckoo search-based approach , 2013 .