Numerical analysis of the instability of excavation face in shield construction

Combined with practical work,according to the settlement accident of ground surface caused by the unsuitable support pressure numerical analysis is made.Based upon analysis of the reasons caused the accident corresponding preventive measures are proposed in order to ensure smooth running of shield construction.