Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains

This study investigates the decisions of replenishment and lead-time reduction for a single-manufacturer multiple-retailer integrated inventory system in which the probability distribution of demand for each retailer is unknown but its mean and variance are given. A decision model is presented and a minimax distribution free procedure is applied to determine the lead time, the common shipment cycle time, the target levels of replenishments and the number of shipments per production cycle so that the expected total system cost can be minimized. A decision support system has been implemented on a personal computer to illustrate the application of the model.

[1]  L. Ouyang,et al.  Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time , 1996 .

[2]  Suresh Kumar Goyal,et al.  The Individually Responsible and Rational Decision Approach to Economic Lot Sizes for One Vendor and Many Purchasers: A Comment* , 1992 .

[3]  L. Ouyang,et al.  A minimax distribution free procedure for mixed inventory model with variable lead time , 1998 .

[4]  L. Ouyang,et al.  Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time , 2004 .

[5]  M. Hariga,et al.  Integrated single vendor single buyer model with stochastic demand and variable lead time , 2004 .

[6]  Yu-Cheng Hsiao,et al.  Integrated inventory models with controllable lead time and backorder discount considerations , 2005 .

[7]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[8]  Avijit Banerjee,et al.  A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange , 1994 .

[9]  Yu-Cheng Hsiao,et al.  Inventory models with back-order discounts and variable lead time , 2001, Int. J. Syst. Sci..

[10]  L. Ouyang,et al.  Analysis of optimal vendor-buyer integrated inventory policy involving defective items , 2006 .

[11]  G. Gallego,et al.  Distribution Free Procedures for Some Inventory Models , 1994 .

[12]  Liang-Yuh Ouyang,et al.  A note on periodic review inventory model with controllable setup cost and lead time , 2004, Comput. Oper. Res..

[13]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[14]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[15]  Wen-Chuan Lee,et al.  Computational algorithmic procedure of optimal inventory policy involving a negative exponential crashing cost and variable lead time demand , 2007, Appl. Math. Comput..

[16]  Wen-Chuan Lee,et al.  Optimal inventory policy involving back-order discounts and variable lead time demand , 2007 .

[17]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[18]  Abdul Raouf,et al.  Inventory Models Involving Lead Time as a Decision Variable , 1994 .

[19]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[20]  C. Liao,et al.  An Analytical Determination of Lead Time with Normal Demand , 1991 .