Managing quality in projects: An empirical study

Abstract The purpose of this paper is to establish the key role of quality in the ‘iron triangle of cost, time and quality’ and highlight the importance of implementing the people related ‘organisation quality’ amongst key stakeholders to deliver the success criteria of a project. The field research design comprised three stages. Stage 1: Semi-structured interviews Stage 2: Questionnaire surveys followed by a conceptual research model. The research model was validated by Partial Least Squares (PLS) modelling Stage 3: Case studies of two comparable large projects based organisations (Heathrow Terminal 5 and High Speed 1). As a substantive contribution to knowledge the research defined project quality with three dimensions (viz. Design Quality, Process Quality and Organisation Quality) and identified the lack of attention to details to Organisation Quality. A mixed methodology of Partial Least Squares (PLS) and case studies was applied. The findings also helped to develop a simple but effective tool APEX (Assessing Process Excellence) to assess the key constructs of project quality and excellence. The paper also provides a summary of the best practices for managing quality.

[1]  Elizabeth Wilhide,et al.  The Millennium Dome , 1999 .

[2]  John Hulland,et al.  Use of partial least squares (PLS) in strategic management research: a review of four recent studies , 1999 .

[3]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[4]  R. Yin Case Study Research: Design and Methods , 1984 .

[5]  Darren Dalcher Models to Improve the Management of Projects , 2007 .

[6]  Ron Basu,et al.  Managing Quality in Projects , 2012 .

[7]  John Haywood-Farmer,et al.  A Conceptual Model of Service Quality , 1988 .

[8]  John S. Oakland,et al.  Tqm: Text with Cases , 2003 .

[9]  Ron Basu,et al.  In search of project excellence: a systems approach of triangulation in a mixed methodology empirical research , 2010 .

[10]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[11]  Ron Basu,et al.  Six-Sigma to operational excellence: role of tools and techniques , 2004 .

[12]  D. Lock Handbook of Project Management , 1968 .

[13]  Min Liu,et al.  A comparative study on adopting human resource practices for safety management on construction projects in the United States and Singapore , 2011 .

[14]  Robert J. Vokurka,et al.  Integrating Six Sigma Concepts in an MBA Quality Management Class , 2008 .

[15]  Chi Ming Tam,et al.  Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures , 1999 .

[16]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[17]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[18]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[19]  Ray Wild Operations Management , 1979 .

[20]  Joseph Moses Juran Juran on leadership for quality : an executive handbook , 1989 .

[21]  Jeffrey K. Pinto,et al.  Critical Success Factors in Effective Project Implementation , 2008 .

[22]  Eric G. Kirby The importance of recognizing alternative perspectives: an analysis of a failed project , 1996 .

[23]  N. Denzin Sociological Methods: A Sourcebook , 1978 .

[24]  H. Wold Systems Analysis by Partial Least Squares , 1983 .

[25]  Ehsan Sadeh,et al.  Improving European foundation for quality management (EFQM) excellence model for implementation in Iranian SMEs , 2010 .

[26]  U. Sekaran Research Methods for Business , 1999 .

[27]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[28]  Sanford I Heisler Project quality and the project manager , 1990 .

[29]  Van Truong Luu,et al.  Improving project management performance of large contractors using benchmarking approach , 2008 .

[30]  Till Dannewald,et al.  Incorporating Latent Variables into Discrete Choice Models — A Simultaneous Estimation Approach Using SEM Software , 2008 .

[31]  Elizabeth C. Ravlin,et al.  Individual Values in Organizations: Concepts, Controversies, and Research , 1998 .

[32]  A. Parasuraman,et al.  A Conceptual Model of Service Quality and Its Implications for Future Research , 1985 .

[33]  W. Edwards Deming,et al.  Out of the Crisis , 1982 .

[34]  Harold Kerzner Project Health Checks , 2014 .

[35]  T. Kotnour Organizational learning practices in the project management environment , 2000 .

[36]  Min Liu,et al.  Construction fatalities in Singapore , 2009 .

[37]  Hisham M. Abdelsalam,et al.  Cost of quality in Dubai: An analytical case study of residential construction projects , 2009 .

[38]  Ron Basu Fit Sigma: A Lean Approach to Building Sustainable Quality Beyond Six Sigma , 2011 .

[39]  Philip B. Crosby,et al.  Quality Is Free: The Art of Making Quality Certain , 1979 .

[40]  Armand V. Feigenbaum,et al.  Total quality control , 1961 .

[41]  Ron Basu,et al.  Implementing Six Sigma and Lean , 2008 .

[42]  J. Rodney Turner,et al.  THE HANDBOOK OF PROJECT-BASED MANAGEMENT , 2008 .

[43]  A. N. Oppenheim,et al.  Questionnaire Design, Interviewing and Attitude Measurement , 1992 .